Orange County NC Website
(i) All gates shall be self- <br />closing and self-latching. <br />Section <br />5.8.2(B)(2)(i) <br />Site Plan of the Application <br />(Attachment 1) <br />[A note has been provided on the site <br />plan.] <br />2, 26 <br />(j) Each facility approved by the <br />Board of Adjustment shall be <br />reviewed annually by the <br />Planning Director to ensure <br />compliance with the standards <br />of evaluation for such facilities <br />and any conditions attached to <br />the application by the Board of <br />Adjustment. Any change in the <br />operation of the facility, which <br />deviates from the original <br />standards and conditions will <br />constitute a modification and <br />will require the approval of the <br />Board of Adjustment. In <br />determining whether a change <br />in the operation of the facility <br />has occurred, the Planning <br />Director shall be guided by the <br />procedures and criteria <br />contained in Sections 2.7.14 <br />and 5.8.2(B). <br />Section <br />5.8.2(B)(2)(j) <br />Attachment 2 – Staff Report <br />[Staff has submitted a condition for this <br />standard.] <br /> <br />2, 27 <br />REQUIREMENT UDO SUPPORTING EVIDENCE FOF <br />General Welfare, Value & Harmony Standards <br /> <br />The use (will / will not) <br />maintain or promote the public <br />health, safety and general <br />welfare, if located where <br />proposed and developed and <br />operated according to the plan <br />as submitted. <br /> <br /> <br />Section 5.3.2 <br />(A)(2)(a) <br /> <br />Application package as contained in <br />Attachment 1 inclusive including, but not <br />limited to: <br />• Narrative; <br />• Site Plan; <br />• Proposed Conditions; <br />• Environmental Assessment (EA) <br />Application; and <br />• Site Plan. <br />Project Correspondence and DAC <br />Comments (Attachment 5) <br />28 <br />The use (will / will not) <br />maintain or enhance the value <br />of contiguous property (unless <br />the use is a public necessity, in <br />Section 5.3.2 <br />(A)(2)(b) <br /> <br />Application package (Attachment 1); <br />Staff Report (Attachment 2); <br />29 <br />190