Browse
Search
7.24.24 BOA Agenda Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Board of Adjustment
>
Agendas
>
2024
>
7.24.24 BOA Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2024 4:59:46 PM
Creation date
7/19/2024 3:59:55 PM
Metadata
Fields
Template:
BOCC
Date
7/24/2024
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
237
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
requirements to qualify for said <br />license have been, or will be, <br />met shall be submitted <br />(b) A floor plan of the <br />proposed facility, showing the <br />use and dimensions of each <br />room and the location of <br />entrances and exits. <br />5.8.2(B)(1)(b) Application (Attachment 1) <br />[The applicant has provided the <br />required floor plan as part of <br />the application package.] <br />2, 8 <br />REQUIREMENT UDO SUPPORTING EVIDENCE FOF <br />Notification Requirements for all Evidentiary Hearings <br />Mailed Notice all adjacent <br />property owners (at least 10 <br />days but no more than 25 days <br />prior) <br />Sections <br />2.7.5(B) and <br />2.7.6(A)(1) <br />NIM and BOA Materials (Attachments 3 <br />& 4) <br />NIM notices mailed by applicant May 6, <br />2024 prior to May 20 NIM. <br />BOA Public Hearing Notices mailed by <br />staff on July 10, 2024. Certification <br />available in Attachment 4. <br />10, 11 <br />Sign Posting on Property (at <br />least 10 days prior) <br />Sections <br />2.7.5(D) and <br />2.7.6(A)(2) <br />NIM and BOA Materials (Attachments 3 <br />& 4) <br />NIM signs posted by staff on May 6, <br />2024 prior to May 20 NIM. Photo <br />documentation available in Attachment <br />4. <br />BOA signs posted by staff on July 9. <br />Certification and photo documentation <br />available in Attachment 4. <br />12 <br />REQUIREMENT UDO SUPPORTING EVIDENCE FOF <br />Waste, Safety and Access Requirements for all SUPs <br />Waste Disposal <br />Method and adequacy of <br />provision for sewage disposal <br />facilities, solid waste and water <br />service. <br />Section <br />5.3.2(B)(1) <br />Exhibit B – Narrative of the Application <br />(Attachment 1) <br />Site Plan of the Application <br /> (Attachment 1) <br />[Both Environmental Health and Solid <br />Waste have indicated they have no <br />concerns.] <br />2, 13 <br />Safety Section <br />5.3.2(B)(2) <br />Site Plan of the Application <br />(Attachment 1) 2, 14 <br />187
The URL can be used to link to this page
Your browser does not support the video tag.