Orange County NC Website
3 20. Setbacks are shown and labeled on the site plan. 21. This note has been added as note 14 under project notes on the cover sheet. 22. Dimension has been added to the site plan sheet. 23. Steep slopes have been identified on the existing conditions sheet. <br />Solid Waste - The requested notes have been added to the cover sheet. - Comment regarding the amount of roll carts provided given the proposed increase in enrollment is <br />noted. <br />Transportation Services 1. Travel mode access opportunities are largely restricted by Erwin Road right-of-way. Currently there <br />is no bike lane infrastructure and the area on the subject parcel’s side of the road is restricted by a <br />stream that runs parallel to Erwin Road along its frontage and a large 60” culvert that crosses <br />beneath the road. Therefore, there is no space to provide a sidewalk in this location either. 2. The proposed traffic count increase does not warrant a Traffic Impact Analysis and the subsequent <br />improvements that may be require as a result thereof. However, traffic impact at this facility is <br />mitigated by staggered pick up times as described on the site plan cover sheet. Furthermore, the <br />pickup and drop off areas are located far from the road into the interior of the site eliminating <br />traffic back up into Erwin Road and allowing ample room for parking and staking to allow for safe <br />access to the building. 152