Orange County NC Website
3. The wastewater system will need to be approved for the increased daily design <br />flow. It is the understanding of this Department that this is pending. <br /> Erosion <br />Control Date: 4/29/24 Staff: <br />Nate Jacobsen <br />njacobsen@orangecountync.gov <br />919-245-2580 <br />1. No comments. <br /> <br /> Fire and Life <br />Safety Date: Staff: <br />Elizabeth Farnan <br />efarnan@orangecountync.gov <br />919-245-6153 <br />No comments received. <br /> NCDOT Date: Staff: <br />Chuck Edwards <br />cnedwards@ncdot.gov <br />336-570-6833 <br />No comments received. <br /> Planning Date: 4/24/24 Staff: <br />Ashley Moncado <br />amoncado@orangecountync.gov <br />919-245-2589 <br />Application <br />1. Elevations or pictures of all structures proposed to be used in the development. <br />2. Confirm with staff a vesting period is not being requested. <br />3. Complete Exhibit A – Statement of Standing. <br />4. Exhibit C does not make any refence to Section 5.3.2(A) or (B) of the UDO. Staff <br />recommends a review of this section and possible revision to application materials to <br />address this section. <br />5. Application materials do not make any reference to existing conditions contained in the <br />2003 Special Use Permit. Staff recommends a review and possible revision to <br />application materials to address existing conditions applied to the property. <br />6. Provide an update to staff regarding status of property value work for submittal (i.e. <br />appraisal or tax records). <br />7. Confirm with staff if conditions are being proposed or not. If yes, please provide to staff <br />for review. <br />8. Documentation and updates regarding the septic and well systems currently under <br />review by the OC EH and the state. <br />Site Plan <br />1. Provide building height and finished floor elevations for all structures on the site. <br />2. Identify and label existing stream and 65-ft. stream buffer. <br />3. Label primary tree protection areas per Section 6.8.4(A). <br />4. Identify plantings and note Section 6.8.7(A) Street Trees will be met. <br />5. Identify plantings and note Section 6.8.7(B) Between Lot Plantings will be met. <br />6. Identify plantings and note Section 6.8.7(C) Foundation Plantings will be met. <br />7. Identify plantings and note Section 6.8.7(D) Landscaping of Vehicular Use Areas will be <br />met. <br />8. The site plan shall show how the facilities will be screened from adjacent properties. A <br />Type-B, 30-foot buffer shall be provided around the facility and outdoor area in <br />accordance with Section 6.8.6. <br />9. Identify screening and note Section 6.8.9 will be met. <br />10. All parking spaces and maneuvering space shall be surfaced with an all-weather paving <br />material, such as asphalt or concrete, and maintained in a safe, sanitary and neat <br />condition. Gravel parking areas may be permitted with the approval of the DAC <br />11. Within areas of the County designated as ‘rural’, as delineated on the Growth <br />Management Systems Map, or within Rural Neighborhood or Rural Industrial Nodes, as <br />delineated on the Orange County Land Use Element Map, the maximum light level <br />147