Browse
Search
7.24.24 BOA Agenda Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Board of Adjustment
>
Agendas
>
2024
>
7.24.24 BOA Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2024 4:59:46 PM
Creation date
7/19/2024 3:59:55 PM
Metadata
Fields
Template:
BOCC
Date
7/24/2024
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
237
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The applicant provided a description of the proposed use and site plan as part of the application packet <br />(Attachment 1). The site plan identifies all elements required by the above listed UDO sections. <br />The applicant has provided a basic environmental assessment as part of this submittal. Staff has <br />reviewed and determined no significant environmental impact is expected from this project based on <br />existing conditions. A Finding of No Significant Impact is available in Attachment 5 of case materials <br />presented to the Board. <br /> <br /> <br />Consistency with 2030 Comprehensive Plan <br />Staff review of the project included consideration for how the requested Special Use Permit relates to <br />the Orange County 2030 Comprehensive Plan. The following analysis outlines elements of the <br />Comprehensive Plan which staff identified as applicable and relevant to the consideration of this <br />request. <br />Chapter 2 – Planning Principles <br />1. Efficient and Fiscally Responsible Provision of Public Facilities and Services: Orange <br />County’s public facilities and services should be delivered in a manner that efficiently uses <br />existing capacity. Expansions of facilities and services should be made only after careful <br />consideration of the costs and benefits of expansion. <br />Staff Comment: Not applicable. <br />2. Sustainable Growth and Development: Growth and development within the county should <br />occur in a pattern, location, and density that is sustainable over the long-term. <br />Staff Comment: The proposed project is permitted as a special use within the RB <br />zoning district should it comply with the UDO standards and meet the standards of <br />evaluation as reviewed by the Board of Adjustment. The existing land use has operated <br />since 2003 at this site with very minimal impacts to the surrounding area. The proposed <br />expansion of the existing use will remain limited to the property, generating low volumes <br />of traffic, and not negatively impacting surrounding properties. The use complies with <br />UDO standards and is consistent with the Comprehensive Plan’s Rural Buffer Future <br />Land Use (Comprehensive Plan Appendix F). <br />3. A. Encouragement of Energy Efficiency, Lower Energy Consumption and Use of Nonpolluting <br />Renewable Energy Resources <br />3. B. Promotion of Both Air Quality Protection and the Development of an Effective <br />Transportation System: Decreasing the use of non-renewable resources and lowering energy <br />consumption are encouraged in both public and private activities. The county’s transportation <br />system should be enhanced to promote more energy efficient modes of travel and improve air <br />quality. <br />Staff Comment: Not applicable. <br />4. Natural Area Resource Preservation: Protection of the County’s natural areas, including <br />forests, wildlife habitat, and other important open spaces should be a priority. The County <br />should work with regional and local organizations, the towns, and private landowners to <br />promote and achieve preservation of the County’s important natural resources. <br />Staff Comment: The applicant provided an Environmental Assessment as part of the <br />application package. Staff has reviewed and determined no significant environmental <br />impact is expected from this project based on existing conditions. The project site plan <br />125
The URL can be used to link to this page
Your browser does not support the video tag.