Browse
Search
7-10-24 PB Agenda Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2024
>
7-10-24 PB Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2024 11:55:40 AM
Creation date
7/18/2024 11:54:29 AM
Metadata
Fields
Template:
BOCC
Date
7/10/2024
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
42 <br /> 1827 and some other things, and one of the specific reasons not to do those is because all of those were established <br /> 1828 exactly to create discrimination against younger folks and go on down the line. And some of the operating <br /> 1829 procedures of what you can do and what you can't do to become a member of the community are flatly outright <br /> 1830 racist. And so, part of the effort to trying not to have to be pushed into one of those models is to set up a different <br /> 1831 kind of model,which has worked successfully elsewhere, see if can be done here. I guess the biggest thing about it <br /> 1832 is, John mentioned this to me and so I'll mention it, one of the things that was part of the design process is the three <br /> 1833 buildings of 20 dwelling units. And one of the reasons that it's very useful is because that's an easy place to be able <br /> 1834 to provide services to people in their dwelling units. It's also one of the places on the property that is going to cost <br /> 1835 the least to build the dwelling units. So,we're looking at this on that model of trying to make it possible to relocate to <br /> 1836 this community from a bigger house. I'm not saying the work is done. You know that, but some of the component <br /> 1837 pieces are just really difficult to put together, and what we haven't really said tonight, but Maria said it a little bit, <br /> 1838 which is a lot of the things you can't get somebody excited about until you've actually got what they think is a project <br /> 1839 that's real. And so,one of the steps in this process has been get to the planning board, get further along in the <br /> 1840 process on those types of things. We've been asked a question about well,what do you know about this financing <br /> 1841 and that financing. Well, I'm not sure I know anybody doing their own house or doing something else that can go into <br /> 1842 the bank and say give me a mortgage for$800,000, I'm thinking about building a house. So,we are in the process of <br /> 1843 doing these steps and we hope we're doing them right, and we hope we gain some good input which we have. <br /> 1844 <br /> 1845 Dolores Bailey: Scott,you said it was going to be a$65 to$75 million project over the full haul and you know <br /> 1846 how many square feet you're going to put into this thing. The way we normally calculate is figuring out how much <br /> 1847 we're talking about per square foot for building. <br /> 1848 <br /> 1849 Scott Radway: It's a slightly different model for the costing of this than I would say an individual building or an <br /> 1850 individual structure. <br /> 1851 <br /> 1852 Beth Bronson: Do a ballpark. You can do a ballpark. <br /> 1853 <br /> 1854 Scott Radway: We can do a ballpark. We can bring it back to you. What the pieces in the ballpark look like <br /> 1855 are wastewater system. We don't have tap fees like you do if you've got public water. We don't have those kinds of <br /> 1856 things but we do have another cost. So,we can't give you specific numbers that are going to be realistic probably a <br /> 1857 month after we give them to you but they're going to be ballpark. Kind of these are the pieces that go into it. This is <br /> 1858 how the cost gets looked at. It's not necessarily something that you might ask, but in a lot of places wouldn't ask, MI <br /> 1859 Homes or Toll Brothers or something about it, they'd just say okay, you've been in business a long time. We think <br /> 1860 you're good. We've got to get to that step to prove it. <br /> 1861 <br /> 1862 Dolores Bailey: My question, and I know you guys can't answer tonight, about affordability is who's going to be <br /> 1863 able to afford it. <br /> 1864 <br /> 1865 Beth Bronson: Thank you very much and to that point, if you're going to have 150 residences and you project <br /> 1866 it's going to be$60 million, it's roughly$400,000.00. I'm, I'm just letting anybody know who's saying that this master <br /> 1867 plan that they're applying for is for 150 residences and in the application, I understand it's 300 bedrooms. Is that <br /> 1868 correct? <br /> 1869 <br /> 1870 Scott Radway: Yes,we're asking for an upset number on dwelling units, 150 and an upset number on <br /> 1871 bedrooms as 300. <br /> 1872 <br /> 1873 Beth Bronson: And what I kind of want to clarify because of the master plan development application is that <br /> 1874 when you are applying for that,you are required to provide, and this may be specifically with conditional zoning, but <br /> 1875 any master plan is conditional, right? So,you are required to provide this level of detail,this level of thought and <br /> 1876 output into what would be the plan. Any deviation from that plan would need to come back to the planning board,to <br /> 1877 my understanding, if you're going to deviate from the master plan as being approved on whatever conditions they're <br />
The URL can be used to link to this page
Your browser does not support the video tag.