Browse
Search
Agenda - 04-20-2004-5f
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2004
>
Agenda - 04-20-2004
>
Agenda - 04-20-2004-5f
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 1:16:28 AM
Creation date
8/29/2008 10:40:46 AM
Metadata
Fields
Template:
BOCC
Date
4/20/2004
Document Type
Agenda
Agenda Item
5f
Document Relationships
Minutes - 20040420
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Northside Buildings The RAMP recommended replacement during 2004. <br />1 2 and 3 <br />The next step in the roof repair process is to contract for the architectural/design services <br />necessary, to solicit bids for the actual repair work, CTL, in tandem with County staff, would <br />provide a turnkey service from assessment of the various roofs in question through roof <br />construction and project close out. The complete scope of work will be performed for a cost of <br />$16,900, which is approximately 8,4.5% of the total projected cost of remedial roof work, <br />Plan Update <br />Staff also recommends that the Board contract with CTL Engineering, Inc. to update the existing <br />Roof Management Program, A summary of the scope of work follows: <br />• CTL will visit each site to confirm the data provided in the existing program, <br />Document the findings with photographs of each roof sector at the various sites, <br />• Revise the existing plan to reflect work that has been accomplished since the last plan <br />was published in 2000 and update the plan to reflect current deficiencies. <br />• Update the computer database to reflect current conditions and observations, to include <br />updated cost information. <br />• Provide Orange County with the updated computer database plus two hard copies of the <br />updated information. <br />The total cast of this work is $7,200. <br />FINANCIAL IMPACT: Funding to support the work proposed has already been appropriated by <br />the BOCC through capital project ordinance based on the 2003-2013 County Capital <br />Investment Plan. <br />RECOMMENDATION(S): The Manager recommends that the Board accept the proposals <br />from CTL Engineering to provide the specified work, and authorize the Purchasing Director to <br />execute the appropriate paperwork, <br />
The URL can be used to link to this page
Your browser does not support the video tag.