Northside Buildings The RAMP recommended replacement during 2004. <br />1 2 and 3 <br />The next step in the roof repair process is to contract for the architectural/design services <br />necessary, to solicit bids for the actual repair work, CTL, in tandem with County staff, would <br />provide a turnkey service from assessment of the various roofs in question through roof <br />construction and project close out. The complete scope of work will be performed for a cost of <br />$16,900, which is approximately 8,4.5% of the total projected cost of remedial roof work, <br />Plan Update <br />Staff also recommends that the Board contract with CTL Engineering, Inc. to update the existing <br />Roof Management Program, A summary of the scope of work follows: <br />• CTL will visit each site to confirm the data provided in the existing program, <br />Document the findings with photographs of each roof sector at the various sites, <br />• Revise the existing plan to reflect work that has been accomplished since the last plan <br />was published in 2000 and update the plan to reflect current deficiencies. <br />• Update the computer database to reflect current conditions and observations, to include <br />updated cost information. <br />• Provide Orange County with the updated computer database plus two hard copies of the <br />updated information. <br />The total cast of this work is $7,200. <br />FINANCIAL IMPACT: Funding to support the work proposed has already been appropriated by <br />the BOCC through capital project ordinance based on the 2003-2013 County Capital <br />Investment Plan. <br />RECOMMENDATION(S): The Manager recommends that the Board accept the proposals <br />from CTL Engineering to provide the specified work, and authorize the Purchasing Director to <br />execute the appropriate paperwork, <br />