Browse
Search
Agenda - 11-15-2005-5g
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2005
>
Agenda - 11-15-2005
>
Agenda - 11-15-2005-5g
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 12:30:36 AM
Creation date
8/29/2008 10:40:44 AM
Metadata
Fields
Template:
BOCC
Date
11/15/2005
Document Type
Agenda
Agenda Item
5g
Document Relationships
Minutes - 20051115
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br />Marian Jackson <br />124 Merritt Mill Rd, <br />Chapel Hill, N,C. 27514 <br />October 5, 2005 <br />ROOF: <br />4. Remove the center chimney below the roof-line. Install matching <br />plywood and framing, <br />5, Remove the flashing on the side chimney, Install an approved <br />corrosion resistive flashing on the chimney. Install step and <br />counter-flashing. <br />WINDOWS: <br />Caulk around all existing windows where the window frame <br />meets the coil stock. The caulldng shall be 100% white silicone. <br />BATHROOM & LAUNDRY: <br />1. Remove the rear section (Bathroom & Laundry Room) to the ground, <br />Remove footings if they exist, Dig, frame & pour new footings <br />and install monolithic slab concrete floor. (Floor plan to match <br />the existing foot-print.) Insta116 mil poly & wire mesh. <br />(Note) Lead Based Paint is present on the bathroom door casing. <br />Use Lead Based Paint Safe Work Practices. <br />2. Frame the bathroom & laundry room using 2x6 walls, 2x8 ceiling <br />joists ,2x8 rafters & 5/8 plywood. All framing shall pass the NC <br />Building Codes, The new rafters shall rest on the main plate of the <br />unit, The rafters shall be on a 4/12 pitch. Refer to plan. <br />3, Install MR sheetrock on all walls & ceiling. Finish the sheetrock <br />smooth, Prime & paint the sheetrock with semi-gloss latex paint, <br />The paint shall cover completely. (Bathroom & laundry) <br />4. Install 3 %a baseboard & shoe molding in the bathroom and laundry <br />room. Prime & paint the molding with semi-gloss latex paint. The <br />paint shall cover completely. <br />Page 3 <br />Install a new 36" wall cabinet in the laundry room. Install the wall <br />cabinet on the end walk (Refer to plan). The finish shall be white, <br />
The URL can be used to link to this page
Your browser does not support the video tag.