Browse
Search
Agenda - 11-15-2005-5g
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2005
>
Agenda - 11-15-2005
>
Agenda - 11-15-2005-5g
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 12:30:36 AM
Creation date
8/29/2008 10:40:44 AM
Metadata
Fields
Template:
BOCC
Date
11/15/2005
Document Type
Agenda
Agenda Item
5g
Document Relationships
Minutes - 20051115
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
to <br />Mazian Jackson <br />124 Merritt Mill Rd. <br />Chapel Hill, NC 27514 <br />Qctober 5, 2005 <br />PLUMBING: <br />Page 7 <br />8, Reinstall the hot water heater, Instal] an approved heater pan and <br />drain. Make provisions before the concrete floor is installed. <br />9. Install an expansion tank on the hot water heater per code. <br />10, Install a cleanout on the main sewer line. The cleanout shall be <br />within Oft of the unit, All plumbing work shall pass the NC <br />Plumbing Codes, <br />MISCELLANEOUS: <br />Remove the oil tank from the back yard,. <br />2, Install a triple 2x8 treated dropped girder across the kitchen floor. <br />Place post jacks every 7ft on center.. The posts shall be placed on <br />solid masonry approved by the Inspection Depaztment. <br />Level the floor as close to the original height as possible. <br />3. Install a new vent for the dryer.. The exhaust shall vent through the <br />exterior side walk <br />4, Reinstall the heatlair vent in the laundry & bathroom, Prepaze the <br />vent for the concrete floor. Install metal ductwork to the floor <br />registers. Wrap the metal duct with 30 ib felt paper, Install new <br />floor registers, <br />5. Install 12 automatic foundation vents around the unit. Install vents <br />where possible, Install all necessary vent wells, <br />6. Place pine straw around the entire drip line of the unit. The pine <br />straw shall be placed a minimum of aft from the unit. <br />Install a new attic access panel in the 2"~ floor bedroom ceiling, <br />Install a new plywood %" door, Nail the loose trim and paint <br />the new access door with semi-gloss paint, <br />
The URL can be used to link to this page
Your browser does not support the video tag.