Orange County NC Website
23 <br /> Task 2—Surveying <br /> • Baseline text file containing the Benchmark data <br /> • Project level closure report <br /> • Traverse closure report <br /> • Deeds and Plats as a PDF <br /> • FS design file <br /> • 3D design file DTM and TIN file <br /> Task 4—Roadway Design <br /> • Design Assumptions Submittal <br /> o Design Assumptions <br /> o Typical Sections <br /> • Draft Recommendation Plan Set Submittal <br /> o Title Sheet <br /> o Typical Sections Sheets <br /> o Plan Sheets with Horizontal Design <br /> o Profile Sheets with Vertical Design <br /> o Cross Sections <br /> o Preliminary Right of Way and easement limits <br /> o Proposed Guardrail Design if required. <br /> o Preliminary Slope Stake lines <br /> o Preliminary Earthwork Summary <br /> o Preliminary Construction Cost Estimate <br /> • Preliminary 65% Submittal <br /> o Approved Draft Recommendation Plan Set <br /> o Proposed Right-of-Way and Easements <br /> o Cross sections <br /> o Updated Preliminary Construction Cost Estimate <br /> • Right of Way Plans <br /> o Proposed Right-of-Way Plans (Right of Way Acquisition and Utility Coordination Services Needed) <br /> • 90% Submittal <br /> o Approved Right-of-Way Plans <br /> o Cross sections <br /> o Estimated Construction Quantities <br /> o Engineer's Construction Cost Estimate <br /> • 100% Submittal(Final) <br /> o Approved 90%Plans <br /> o Cross sections <br /> o Estimated Construction Quantities <br /> o Engineer's Construction Cost Estimate <br /> • Final Sealed Plans and Bid Document Submittal <br /> o Approved 100%Plans <br /> o Estimated Construction Quantities <br /> o Engineer's Construction Cost Estimate <br /> Task 5—Drainage and Erosion Control Design <br /> • Preliminary 60%Plan Submittal <br /> o Drainage Design <br /> o Preliminary Erosion and Sediment Control Design <br /> • 90%Plans Submittal <br /> o Drainage Summary Sheet& Quantities <br /> o Erosion Control Plans to NCDEQ <br /> Page 13 <br />