Orange County NC Website
19 <br /> Task 10- Utility Coordination (TELICS)- OPTIONAL ADDITIONAL SERVICES <br /> Task 10.1 —Utility Coordination <br /> • Identify,research, and contact all utility owners through the project corridor. <br /> • Identify utility level of impacts through the corridor. <br /> • Coordinate and run all utili, meetings and distribute minutes.(Kick Off,One on One w/Utilities,Pre-Construction) <br /> • Obtain documentation from utilities claiming prior rights and confirm. <br /> • PUE requests and assist. <br /> • Review Utilities' markups. <br /> • Full plan reviews to minimize and avoid utilitimpacts. (Roawqy, Drainage) <br /> • Assist Engineer in all areas for clarity of utility impacts, schedule, and relocation. <br /> • URA packages assist. <br /> • Utility encroachment packages assist. <br /> • UBO plans <br /> • Special provisions <br /> • Deliverables: <br /> 1. Utility kick-off meeting coordination <br /> 2. Utility meeting minutes <br /> 3. Utility relocation schedule <br /> 4. UBO <br /> 5. Special provisions <br /> 6. Utility packages <br /> • Exclusions: <br /> 1. WET Utility Design not included <br /> 2. Preparation of permit drawings not included. <br /> Task 3 Fee: $56,082.59 <br /> Task 11 - Bid Services- OPTIONAL ADDITIONAL SERVICES <br /> Task 11.1 —Bid Document <br /> WSP will prepare the Bid Construction Document in NCDOT format and specifications for municipalities in preparation of <br /> the project letting. <br /> Page 9 <br />