Orange County NC Website
14 <br /> NNNI ) <br /> Quality Level B (QLB) -WSP will use industry acceptable methods to search for and designate the approximate <br /> horizontal position of existing utilities within the survey limits. Utilities will be marked on the ground surface in <br /> accordance with American Public Works Association(APWA)color codes based upon its type. Utilities whose type <br /> cannot be identified due to the lack of above ground due to the lack of above ground appurtenances will be marked in pink <br /> paint within the survey limits and annotated as"Unknown"in final deliverables. <br /> Task 3 Fee: $33,788.02 <br /> Task 4— Roadway Design <br /> Task 4.1 —Coordination <br /> WSP's team will coordinate with the ORANGE COUNTY and their designated representatives throughout the duration of <br /> this task order. The coordination will include regular transmittals of correspondence and records, as well as telephone <br /> contact for items requiring immediate attention. WSP's team will coordinate with NCDOT for their review. <br /> Task 4.2—Draft Recommendation Plan Set 30%Plan <br /> The Draft Recommendation Plan set will be prepared in accordance with but not limited to: <br /> • NCDOT Roadway Design Manual <br /> • 2024 NCDOT Roadway Standards Drawings <br /> • 2024 Standard Specifications for Roads and Structures <br /> • A Policy on Geometric Design of Highways and Streets AASHTO 2018 <br /> • NCDOT Complete Streets Implementation and Planning Guidelines <br /> WSP shall prepare Design Assumptions for the ORANGE COUNTY and NCDOT to review and approve before starting <br /> the draft recommendation plan set. WSP will prepare the Draft Recommendation Plan set using approved design <br /> assumptions to meet as stated above guidelines at a scale of 1"=50'horizontal and 1"=5'vertical. WSP shall prepare Draft <br /> Recommendation Plan Set and cross sections using Bentley Open Road Designer. <br /> WSP will submit a full-size set of the Draft Recommendation Plans in pdf format. <br /> ORANGE COUNTYshall review the Draft Recommendation Plans and provide comments for consultant to address. WSP <br /> shall attend one (1) meeting with the ORANGE COUNTY staff to discuss the review comments. WSP will revise plans per <br /> ORANGE COUNTY comments and provide a preliminary construction cost estimate at 30% approval. It is assumed that <br /> comments from the ORANGE COUNTY will be returned within 15 business days ofsubmittal. <br /> Task 4.3 —65%Plan Submittal <br /> The 65% Plan Submittal shall be the approved Draft Recommendation Plan set developed to the stage at which <br /> approximately 65% of the final design for the project is complete. WSP shall incorporate Drainage, preliminary Erosion <br /> and Sediment Control,Right of Way, and prepare 30%concept Traffic Management Plans. Detailed scopes for these tasks <br /> are included in respective sections. <br /> WSP will submit a full-size set of the 65%Design Plans in pdf format. <br /> ORANGE COUNTY shall review the 65%Design and provide comments for WSP to address. WSP shall attend one (1) <br /> meeting with the ORANGE COUNTY/NCDOT staff to discuss the review comments. WSP will revise plans per ORANGE <br /> Page 4 <br />