Orange County NC Website
13 <br /> and to a turning point past the last baseline point then looped back to the GPS pair running through all baseline <br /> points twice. The Benchmark information will be included in the baseline alignment text file as a separate section <br /> at the end. WSP will provide a spreadsheet showing the level loop raw closures and adjusted results. <br /> 6. Perform Pavement DTM data collection of all"L"and"Y"Lines as indicated in the project limits as noted above. <br /> Only edge of pavements and pavement crowns will be surveyed. <br /> 7. WSP will make every effort to locate property monumentation and tie down all 10 properties within the project <br /> limits. <br /> 8. WSP will use deeds and plats and field evidence to accurately depict each property with the project limits. Smaller <br /> properties will be closed out and mapped per NCDOT standards. For larger properties, only the lines within the <br /> project limits will be mapped other lines may be mapped and shown per the surveyor's discretion. The R/W will be <br /> established per records and field evidence. <br /> 9. WSP will gather enough ground shots within the project limits to accurately depict the terrain within survey limits <br /> as noted above. All breaklines, ditches and check shots will be surveyed. Shots will not exceed 50'. <br /> 10. WSP will contact 811 to mark utilities within the project limits to support our SUE services. <br /> 11. WSP will locate and provide pipe size and inverts for any storm utility structures within the project limits. WSP <br /> will always carry one structure past project limits. Driveway culvert inverts will be collected. <br /> 12. WSP will produce a 2D MicroStation DGN as per Location & Surveys guidelines. SUE performed by WSP and <br /> 811 and conventional survey data will be merged into FS file. WSP will produce survey data into the 3D design <br /> file. <br /> 13. WSP will be allowed time for travel from the office to the job site. This project is approximately 1-hour round trip. <br /> WSP will make all practicable efforts to consolidate trips to the job site. <br /> 14. WSP will be allowed time for project management and supervision. <br /> 15. WSP will be allowed time for traffic control and safety. <br /> Task 2 Fee: $74,587.63 <br /> Task 3— Subsurface Utility Engineering <br /> Task 3.1 —SUE <br /> WSP proposes to provide the following Subsurface Utility Engineering(SUE)Quality Levels on this project. All SUE <br /> services will be performed in accordance with Cl/ASCE 38-02"Standard Guidelines for the Collection and Depiction of <br /> Existing Subsurface Utility Data". <br /> Quality Level D (QLD)—WSP shall request utility record information from facility owners(public and/or private)with <br /> infrastructure within the project limits. The Client in encouraged to share with WSP all available information within their <br /> possession pertaining to existing utilities within the project limits. Records research must be performed to meet the <br /> standards definition for Quality Level C and Quality Level B SUE data. <br /> Quality Level C (QLC)—WSP shall perform survey of above ground appurtenances within the survey limits. Known <br /> utilities,based upon available utility record data,within these limits whose horizontal position cannot be determined due <br /> to known and/or unknown environmental factors will be depicted in the final deliverable based upon record data and <br /> correlated to survey. These utilities will be annotated as"DATUR"(depicted according to utility record). <br /> Page 3 <br />