Orange County NC Website
11 <br /> " I Attachment 1 <br /> Scope of Services and Fee Estimate <br /> Transit Access Sidewalk Along Orange Grove Road <br /> Orange County <br /> Under this scope of services, WSP will provide Surveying, Right of Way, Utility Coordination and Design Services for <br /> adding a sidewalk on the westside from Cedar Ridge High School first driveway on New Grady Brown School Road to the <br /> intersection with Orange Grove Road(approximately 500 ft.). Then heading north on Orange Grove Road approximately <br /> 1 mile to Eflin Boulevard. <br /> Contents <br /> Task 1 — Project Management and Project Administration.............................................................................................2 <br /> Task2—Surveying .............................................................................................................................................................2 <br /> Task 3—Subsurface Utility Engineering...........................................................................................................................3 <br /> Task4— Roadway Design..................................................................................................................................................4 <br /> Task 5— Drainage and Erosion Control Design...............................................................................................................6 <br /> Task6—Traffic Management.............................................................................................................................................6 <br /> Task7— Pavement Marking Plans.....................................................................................................................................7 <br /> Task 8—Structure Plans Orange Grove Road over 1-40 — Prefabricated Bridge (30% PGD) .......................................7 <br /> Task 9— Right of Way Services (Right of Way Consultants)—OPTIONAL ADDITIONAL SERVICES...........................8 <br /> Task 10 — Utility Coordination (TELICS)—OPTIONAL ADDITIONAL SERVICES...........................................................9 <br /> Task 11 — Bid Services—OPTIONAL ADDITIONAL SERVICES.......................................................................................9 <br /> Task 12 — Geotechnical Services .................................................................................................................................... 10 <br /> Task 13— 100%Structure Plans Pre-Fabricated Pedestrian Bridge over 1-40—OPTIONAL ADDITIONAL SERVICES <br /> ............................................................................................................................................................................................ 11 <br /> Deliverables....................................................................................................................................................................... 12 <br /> Page 1 <br />