Browse
Search
Agenda - 06-18-2024; 8-n - Professional Engineering Contract – Transit Access Sidewalk for Orange Grove Road
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2024
>
Agenda - 06-18-2024 Business Meeting
>
Agenda - 06-18-2024; 8-n - Professional Engineering Contract – Transit Access Sidewalk for Orange Grove Road
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2024 2:51:29 PM
Creation date
6/13/2024 2:11:26 PM
Metadata
Fields
Template:
BOCC
Date
6/18/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-n
Document Relationships
Agenda for June 18, 2024 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2024\Agenda - 06-18-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: E5E3F6C3-1140-45DC-9E04-D9C3A4A5DE3A <br /> 51 <br /> RIGHT TO INSPECT <br /> The Department and representatives of the Federal Highway Administration shall have the right <br /> to inspect, sample or test, and approve or reject, any portion of the work being performed by the <br /> Municipality or the Municipality's contractor to ensure compliance with the provisions of this <br /> Agreement. Prior to any payment by the Department, any deficiencies inconsistent with approved <br /> plans and specifications found during an inspection must be corrected. <br /> CONTRACTOR COMPLIANCE <br /> The Municipality will be responsible for ensuring that the contractor complies with all of the terms <br /> of the contract and any instructions issued by the Department or FHWA as a result of any review <br /> or inspection made by said representatives. <br /> CHANGE ORDERS <br /> If any changes in the Project plans are necessary, the Department must approve such changes <br /> prior to the work being performed. <br /> SHOP DRAWINGS <br /> Shop Drawings shall be submitted in accordance with the approved plans and specifications and <br /> may require review by the Designer. <br /> 17.CLOSE-OUT <br /> Upon completion of the Project, the Municipality shall be responsible for the following: <br /> FINAL INSPECTION <br /> The Municipality shall arrange for a final inspection by the Department. Any deficiencies <br /> determined during the final field inspection must be corrected prior to final payment being made <br /> by the Department to the Municipality. Additional inspection by other entities may be necessary <br /> in accordance with the Department's guidelines and procedures. The Municipality shall provide <br /> the Department with written evidence of approval of completed project prior to requesting final <br /> reimbursement. <br /> Agreement ID# 11619 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.