Browse
Search
Agenda - 06-18-2024; 8-n - Professional Engineering Contract – Transit Access Sidewalk for Orange Grove Road
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2024
>
Agenda - 06-18-2024 Business Meeting
>
Agenda - 06-18-2024; 8-n - Professional Engineering Contract – Transit Access Sidewalk for Orange Grove Road
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2024 2:51:29 PM
Creation date
6/13/2024 2:11:26 PM
Metadata
Fields
Template:
BOCC
Date
6/18/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-n
Document Relationships
Agenda for June 18, 2024 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2024\Agenda - 06-18-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: E5E3F6C3-1140-45DC-9E04-D9C3A4A5DE3A <br /> 50 <br /> M CONSTRUCTION <br /> The Municipality, and/or its agents shall construct the Project in accordance with the plans and <br /> specifications of the Project as filed with, and approved by, the Department. During the <br /> construction of the Project, the procedures set out below shall be followed: <br /> CONSTRUCTION CONTRACT ADMINISTRATION <br /> The Municipality shall comply with the NCDOT Construction Manual as referenced at <br /> http://www.ncdot.org/doh/operations/dp%5Fchief%5Feng/constructionunit/formsmanuaIs/construc <br /> tion/, which outlines the procedures for records and reports that must be adhered to in order to <br /> obtain uniformity of contract administration and documentation. This includes, but is not limited <br /> to, inspection reports, material test reports, materials certification, documentation of quantities, <br /> project diaries, and pay records. The Municipality, and/or its agent, shall perform the construction <br /> engineering, sampling and testing required during construction of the Project, in accordance with <br /> Departmental procedures, including the Department's Guide for Process Control and Acceptance <br /> Sampling and Testing. The Municipality shall document that said compliance was accomplished <br /> in accordance with State and Federal procedures, guidelines, standards and specifications. <br /> RETAINAGE <br /> The Municipality shall not retain any portion of a payment due the contractor. <br /> SIGNAGE <br /> The Municipality shall provide and maintain adequate signage and other warning devices for the <br /> protection of the public in accordance with the approved traffic control plans for the Project and <br /> the current edition of the Manual on Uniform Traffic Control Devices (MUTCD)for Streets and <br /> Highways, or any subsequent revision of the same, published by the Federal Highway <br /> Administration and effective at the time of award of the contract. <br /> SITE LAYOUT <br /> The Municipality shall be responsible for ensuring that all site layout, construction work, and <br /> Project documentation are in compliance with applicable city, state and federal permits, <br /> guidelines, and regulations, including American Association of State Highway and Transportation <br /> Officials (AASHTO) guidelines and Americans with Disabilities Act(ADA) Standards for <br /> Accessible Design (www.usdow.gov/crt/ada/stdspdf.htm). <br /> Agreement ID# 11619 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.