Browse
Search
Agenda - 06-18-2024; 8-n - Professional Engineering Contract – Transit Access Sidewalk for Orange Grove Road
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2024
>
Agenda - 06-18-2024 Business Meeting
>
Agenda - 06-18-2024; 8-n - Professional Engineering Contract – Transit Access Sidewalk for Orange Grove Road
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2024 2:51:29 PM
Creation date
6/13/2024 2:11:26 PM
Metadata
Fields
Template:
BOCC
Date
6/18/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-n
Document Relationships
Agenda for June 18, 2024 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2024\Agenda - 06-18-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: E5E3F6C3-1140-45DC-9E04-D9C3A4A5DE3A <br /> 47 <br /> 11.UTILITIES <br /> The Municipality, and/or its agent, at no liability to the Department, shall relocate, adjust, relay, <br /> change or repair all utilities in conflict with the Project, regardless of ownership. All utility work <br /> shall be performed in a manner satisfactory to and in conformance with State and Federal rules <br /> and regulations, prior to Municipality beginning construction of the project. This Agreement does <br /> not modify or supersede any existing Utility Encroachment Agreements that may be in place. <br /> 12.RIGHT OF WAY / UTILITY / RAILROAD CERTIFICATION <br /> The Municipality, upon acquisition of all right of way/property necessary for the Project, relocation <br /> of utilities, and coordination with the railroad shall provide the Department all required <br /> documentation (deeds/leases/easement/plans/agreements)to secure certification. Certification is <br /> only issued after all ROW is in public ownership or property is publicly accessible by a legal <br /> document; utilities in conflict with the project are relocated, or a plan for their relocation during <br /> construction has been approved; and coordination with the railroad (if applicable) has occurred <br /> and been documented. <br /> 13.CONTRACT PROPOSAL AND ENGINEER'S ESTIMATE <br /> CONTRACT PROPOSAL <br /> The Municipality shall develop a contract proposal that will be advertised for bids. The proposal <br /> shall comply with NCDOT Specifications and Standard Drawings as applicable to the Project. <br /> The proposal shall also contain provisions, as applicable, per Title 23 Code of Federal <br /> Regulations 633 and 635 to include, but not be limited to: FHWA 1273, Buy America, Davis- <br /> Bacon Wage Rates, Non-discrimination, DBE Assurances, Contractor Certification regarding <br /> suspension and debarment, and other provisions as required by the Department. <br /> ENGINEER'S ESTIMATE <br /> The Municipality shall develop an itemized engineer's estimate to show items referenced to the <br /> NCDOT Standard Specifications, if applicable, along with units and unit price. The engineer's <br /> estimate will be used as the basis for comparing bids received. <br /> Agreement ID# 11619 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.