Browse
Search
Agenda - 06-18-2024; 8-n - Professional Engineering Contract – Transit Access Sidewalk for Orange Grove Road
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2024
>
Agenda - 06-18-2024 Business Meeting
>
Agenda - 06-18-2024; 8-n - Professional Engineering Contract – Transit Access Sidewalk for Orange Grove Road
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2024 2:51:29 PM
Creation date
6/13/2024 2:11:26 PM
Metadata
Fields
Template:
BOCC
Date
6/18/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-n
Document Relationships
Agenda for June 18, 2024 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2024\Agenda - 06-18-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: E5E3F6C3-1140-45DC-9E04-D9C3A4A5DE3A <br /> 37 <br /> Executive Summary <br /> The Executive Summary is a summation of this agreement and is not intended to be used <br /> as the agreement between the Department (North Carolina Department of Transportation) <br /> and the Party (Entity). <br /> Entity: City of Greensboro County: Guilford <br /> TIP: U-5842 <br /> Project: Pisgah Church Road and Elm Street Intersection Improvements <br /> Scope: improvements and constructing turn lanes, medians, sidewalks, signal modifications and <br /> bike lanes at Pisgah Church Road (non-system) and North Elm Street (non-system) in Greensboro. <br /> Eligible Activities: <br /> Design <br /> PE 54042.1.1 <br /> Environmental <br /> ROW Acquisition <br /> ROW 54042.2.2 <br /> Utility Relocation <br /> CON 54042.3.FD1 Construction <br /> OTHER STP-0708(088) <br /> FEDERAL-AID <br /> Fund Source Federal Funds Reimbursement Non-Federal Non-Federal <br /> Amount Rate Match $ Match Rate <br /> STP-DA $744,000 80 % $186,000 20 % <br /> Total Available Funding $930,000 <br /> Responsibility: The City of Greensboro shall be responsible for all aspects of the project. <br /> Agreement ID# 11619 <br />
The URL can be used to link to this page
Your browser does not support the video tag.