Browse
Search
Agenda - 06-18-2024; 8-n - Professional Engineering Contract – Transit Access Sidewalk for Orange Grove Road
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2024
>
Agenda - 06-18-2024 Business Meeting
>
Agenda - 06-18-2024; 8-n - Professional Engineering Contract – Transit Access Sidewalk for Orange Grove Road
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2024 2:51:29 PM
Creation date
6/13/2024 2:11:26 PM
Metadata
Fields
Template:
BOCC
Date
6/18/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-n
Document Relationships
Agenda for June 18, 2024 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2024\Agenda - 06-18-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
22 <br /> General Construction notes <br /> Construction Cost Estimate <br /> Engineering will be in accordance with,but not limited to: <br /> • NCDOT Structures Design Manual <br /> • AASHTO LRFD Bridge Design Specifications <br /> • AASHRO LRFD Guide Specifications for the Design of Pedestrian Bridges <br /> Specifications will be based on NCDOT's 2024 Standard Specifications for Road and Structures, and it is assumed that no <br /> additional development of supplemental specifications will be required. <br /> Task 13.2—Stamped 100%Plans <br /> Upon receipt of comments from the ORANGE COUNTY,WSP will prepare Stamped(100%)Plans to address all <br /> comments and submit an electronic copy to the ORANGE COUNTY with Final Quantities and the Engineer's Estimate. <br /> Assumptions: <br /> - WSP assumes that no bridge type study is required for this bridge, a signature bridge is not included in this scope. <br /> - WSP assumes that preliminary structural design will not be required for the preliminary plans submittal. Only <br /> bridge layout/location will be determined at this stage. <br /> - Bridge loading will be confirmed with the ORANGE COUNTY, anticipated loading is pedestrian loading only <br /> (no emergency vehicles). Deck design will be prepared for by the truss fabricator. <br /> - Lighting on the proposed structure is not included as part of this scope. <br /> - Any additional structural services for design of a different bridge type, approach ramps or retaining walls are not <br /> included in this scope. <br /> - WSP assumes that no hydrologic/hydraulic/scour analysis is required for this bridge. <br /> - WSP assumes that subsurface geotechnical investigation, foundation recommendations, and any shoring design <br /> required for construction,will be provided by others prior to beginning 90%Plan Development. <br /> TASK 3 FEE$34,965.66 <br /> Deliverables <br /> Task I—Project Management <br /> • Project Management Plan(PMP) <br /> • Quality Management Plan(QMP) <br /> • Initial Project Schedule <br /> • Draft and final meeting minutes following meetings <br /> • Documentation of General Coordination activities <br /> Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.