Browse
Search
Agenda - 06-18-2024; 8-n - Professional Engineering Contract – Transit Access Sidewalk for Orange Grove Road
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2024
>
Agenda - 06-18-2024 Business Meeting
>
Agenda - 06-18-2024; 8-n - Professional Engineering Contract – Transit Access Sidewalk for Orange Grove Road
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2024 2:51:29 PM
Creation date
6/13/2024 2:11:26 PM
Metadata
Fields
Template:
BOCC
Date
6/18/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-n
Document Relationships
Agenda for June 18, 2024 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2024\Agenda - 06-18-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19 <br /> Task 10- Utility Coordination (TELICS)- OPTIONAL ADDITIONAL SERVICES <br /> Task 10.1 —Utility Coordination <br /> • Identify,research, and contact all utility owners through the project corridor. <br /> • Identify utility level of impacts through the corridor. <br /> • Coordinate and run all utili, meetings and distribute minutes.(Kick Off,One on One w/Utilities,Pre-Construction) <br /> • Obtain documentation from utilities claiming prior rights and confirm. <br /> • PUE requests and assist. <br /> • Review Utilities' markups. <br /> • Full plan reviews to minimize and avoid utilitimpacts. (Roawqy, Drainage) <br /> • Assist Engineer in all areas for clarity of utility impacts, schedule, and relocation. <br /> • URA packages assist. <br /> • Utility encroachment packages assist. <br /> • UBO plans <br /> • Special provisions <br /> • Deliverables: <br /> 1. Utility kick-off meeting coordination <br /> 2. Utility meeting minutes <br /> 3. Utility relocation schedule <br /> 4. UBO <br /> 5. Special provisions <br /> 6. Utility packages <br /> • Exclusions: <br /> 1. WET Utility Design not included <br /> 2. Preparation of permit drawings not included. <br /> Task 3 Fee: $56,082.59 <br /> Task 11 - Bid Services- OPTIONAL ADDITIONAL SERVICES <br /> Task 11.1 —Bid Document <br /> WSP will prepare the Bid Construction Document in NCDOT format and specifications for municipalities in preparation of <br /> the project letting. <br /> Page 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.