Browse
Search
Agenda - 06-18-2024; 8-n - Professional Engineering Contract – Transit Access Sidewalk for Orange Grove Road
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2024
>
Agenda - 06-18-2024 Business Meeting
>
Agenda - 06-18-2024; 8-n - Professional Engineering Contract – Transit Access Sidewalk for Orange Grove Road
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2024 2:51:29 PM
Creation date
6/13/2024 2:11:26 PM
Metadata
Fields
Template:
BOCC
Date
6/18/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-n
Document Relationships
Agenda for June 18, 2024 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2024\Agenda - 06-18-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17 <br /> • NCDOT Roadway Design Manual <br /> • 2024 NCDOT Roadway Standards Drawings <br /> • 2024 Standard Specifications for Roads and Structures <br /> • MUTCD(Current Version) <br /> The Consultant shall prepare construction traffic control phasing and general notes for the proposed improvements. The <br /> Consultant shall prepare Intermediate Contract Times (ICT's) and Liquidated Damages (LD's) in coordination with the <br /> Client,to identify all time restrictions for construction operations that affect traffic. These ICT's and LD's will be included <br /> as part of the project special provisions. <br /> The final traffic control plans shall include a phasing sequence which shall include the work to be done in each phase, the <br /> traffic control details to be used for each phase, and any associated ICT's and LD's. Plan sheet drawings, such as staging <br /> plans and details,will not be provided. <br /> Traffic control quantities will not be provided. The Consultant will determine an appropriate construction cost percentage <br /> to account for traffic control costs for the project. The percentage will be developed in coordination with the Client and <br /> industry averages for similar projects constructed recently in the area. <br /> Task 6 Fee: $5,161.52 <br /> Task 7— Pavement Marking Plans <br /> The Pavement Marking Plans will be prepared in accordance with but not limited to: <br /> • NCDOT Roadway Design Manual <br /> • 2024 NCDOT Roadway Standards Drawings <br /> • 2024 Standard Specifications for Roads and Structures <br /> • MUTCD(Current Version) <br /> • 2009 NC Supplement to the MUTCD <br /> WSP will develop Final Pavement Marking Details for the proposed sidewalk improvements along New Grady Brown <br /> School Road and Orange Grove Road in Hillsborough,NC. The details will include all proposed pavement markings <br /> associated with the proposed sidewalk and curb ramps improvements including pedestrian crosswalks and stop bars at all <br /> side street crossings. Submittals will include a 90%Plan Review and 100%Final Submittal and Final Sealed Plans along <br /> with bid documents. <br /> Task 7 Fee: $5,939.28 <br /> Task 8— Structure Plans Orange Grove Road over 1-40—Prefabricated Bridge (30% PGD) <br /> Task 10.1 —30%Preliminary Drawings(30%PGD) <br /> WSP will provide preliminary engineering for a prefabricated pedestrian bridge located west of the Orange Grove Road <br /> over I-40 bridge(Bridge#670262). The alignment and typical section will be determined by roadway, including clear <br /> distance between the proposed bridge and existing bridge and the proposed clear bridge width. It is assumed the new <br /> structure will consist of a prefabricated superstructure on concrete end bents and bents that will be in similar alignment as <br /> the substructure on the existing adjacent roadway bridge#670262. <br /> Generally, design tasks at this phase will include: <br /> Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.