Browse
Search
Agenda - 06-18-2024; 8-a - Minutes
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2024
>
Agenda - 06-18-2024 Business Meeting
>
Agenda - 06-18-2024; 8-a - Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2024 2:43:32 PM
Creation date
6/13/2024 2:06:50 PM
Metadata
Fields
Template:
BOCC
Date
6/18/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-a
Document Relationships
Agenda for June 18, 2024 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2024\Agenda - 06-18-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
41 <br /> 1 Slide #22 <br /> Multimodal Corridor Plan - Funding <br /> Rehuiiding American Infrastructure with <br /> Sustainability and Equity (RAISE) <br /> • Safe Streets For All (SS4A) <br /> + • TPM Bus and Bus Facility Grant Program T( PM) <br /> • Transportation Improvement Program (STIP) <br /> Complete Streets <br /> • SPOT Safety/Mobility/HSIP <br /> Private Development <br /> Local Government <br /> � r <br /> 2 22 <br /> 3 <br /> 4 Slide #23 <br /> Multimodal Corridor Plan - Development <br /> 6.2.4 Private Development Interests <br /> There are multiple recommendations(fe,A.9,2, B.11,2,C.11.2, etc.)that encourage jurisdictions <br /> to codify policies that require developers along US 70 to either construct sidewalk along their <br /> frontages, dedicate ROW for future construction. or pay in lieu as new developments are <br /> permitted and constructed. Each jurisdiction should develop a policy that details the level of <br /> these requirements tailored to their specific community, but which would result In <br /> implementation of the recommendations through private funds.7h1s way,while built in pieces, <br /> the outcome is a consistent and connected US 70 corridor within each jurisdiction. <br /> Eflland-Buckhor-nMlcbaTie <br /> 44 <br /> Access Management Plari <br /> COMPREHENSWE <br /> 1 ; SUSTAINABILITY <br /> 1 1 <br /> 5 .. a <br /> 6 <br /> 7 <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.