Orange County NC Website
Commissioner Approved Fee Schedule - FY 2024-25 27 <br /> Last <br /> Department/Program Description Current Fee Revision <br /> Erosion <br /> Control/Stormwater Erosion and Sedimentation Control Plan Review and <br /> Management Inspection Fees <br /> Buffer Authorization Certificate(BAC) $250.00 2024 <br /> Floodplain Development Permit(FDP) $250.00 2024 <br /> Residential and Non-Residential development $300 minimum+$300/ac 2023 <br /> $450.00 min+$450.00 per acre or fraction <br /> Erosion Control Plan Revisions thereof 2024 <br /> Skimmer Basin Sediment, Trap, and/or Diversion <br /> Ditch Review $200.00 2024 <br /> Land Disturbing(Grading)Permits <br /> Less than 10 acres $600 minimum+$600/ac 2023 <br /> Greater than 10 acres but less than 25 acres $1,200/ac 2023 <br /> Greater than 25 acres $1,800/ac 2023 <br /> Plan Re-Review Fee for >1 disapproval 2nd Initial dissaproval no fee;subsequent <br /> subsequent disapprovals disapproval 50%of the initial plan review fee 2024 <br /> Unscheduled Site Re-Inspection for Single Family $250 per re-inspection <br /> House(SFH) 2024 <br /> Unscheduled Site Re-Inspection for Subdivision, $500.00 per re-inspection <br /> Commercial,Industrial 2024 <br /> Unperm(SFH) itted Land Disturbance:Single Family House $500.00 2024 <br /> Unpermitted Land Disturbance:Subdivision, $1,000.00 <br /> Commerical,Industrial 2024 <br /> Private Roads $155.00 1998 <br /> Stone water Management Plans $500 per SCM 2019 <br /> Stone water Management Plan Review(LID) $300.00 2019 <br /> Conservation Area Document Review $200 per area 2019 <br /> Re-Inspection of Stormwater Control Measure(SCM) 1 st inspection no fee <br /> associated with a failed SCM inspection report $250 per SCM inspection thereafter 2021 <br /> Inspection of Stormwater Control Measure (SCM) <br /> associated with a Notice of Violation(NOV) $250 per SCM inspection 2021 <br /> Recurring 5-Year Inspection of Stormwater Control <br /> Measure(SCM) $750 per SCM 2021 <br /> At cost for legal ad and notifications to <br /> process if appealed to Public Hearing per UDO <br /> Appeal of Land Disturbing(Grading)Permit 2.26.8&9 2021 <br /> Stream Origin and Intermittent/Perennial <br /> Surface Water Identification(SWID)field work. Determinations:$200/determination 2024 <br /> Stop Work Order/Notice of Violation for Single <br /> Family House(SFH) $500.00 per order 2024 <br /> Stop Work Order/Notice of Violation for Subdivision, <br /> Commerical,Industrial $1,000.00 per order 2024 <br /> Engineering Plan Review $500.00 regardless of project size 2024 <br /> Utility Construction Observation $100.00 per hour 2024 <br />