Orange County NC Website
TIP/WBS # DescriptionLET/Start DateCompletion DateCost Status Project LeadNCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENTHL-0045 Repair Bridge #241 on Exchange Park Lane over Eno River from South Churton Street to Faribult Lane in Hillsborough9/26/2024 FY2027 $153,800 Agreement executed, Hillsborough to prepare environmental documents and plans. Review of final plans underway.Town of Hillsborough/Stephen RobinsonHS-2007J Install a new crosswalk with Rapid Rectangular Flashing Beacons (RRFB), raised center island, pedestrian signage, and approximately 125 linear feet of sidewalk on NC 86 at Critz Drive in Chapel Hill11/21/2024 6/30/2025 $300,000 Planning and deisgn activities underway Suzana MattsBR-0092 Replace Bridge #37 on NC 86 over New Hope Creek 8/19/2025 FY2028 $2,900,000 Planning and design activities underway Alexander FosterI-3306AC I-40 at NC 86 - Upgrade to superstreet from Northwood Drive to Ramp C/D at I-40 interchange10/21/2025 FY2028 $4,350,000 Planning and design activities underway Radha AttaluriC-5650 Construct sidewalk on one side of SR 1919 (Smith Level Road/S. Greensboro St.) from Public Works Drive to the northern end of Old Pittsboro Road in Carrboro12/4/2025 FY2028 $1,718,000 Carrboro approved to incorporate water line work into design. Env doc returned w comments on 12/10/21. Document to be updated to include additional limits for resurfacing. NCDOT waiting on revised plans to be submitted for reviewTown of Carrboro/Stephen RobinsonHO-0013 51177.1.1 51177.2.1 51177.2.2 51177.3.1Chapel Hill from Franklin Street and Rosemary Street, and the streets in between from Merritt Mill Road to Henderson Street in downtown Chapel Hill. Install new mast arm and curb and sidewalk improvements.2/26/2026 FY28 $2,100,000 Project approved by BOT and assigned. Municipal agreement executed.Stephen RobinsonBP7-R009 Replace Bridge #11 on SR 1336 (Halls Mill Road) 9/17/2026 FY2029 $2,900,000 Planning and design activities underwayROW acquisisition underway.Daniel DagenhartEB-5886A Construct sidewalk/MUP/bike lanes on Estes Drive from SR 1772 (North Greensboro Street) to south of Norfolk Southern Railroad Tracks in the Town of Carrboro9/17/2026 FY2029 $848,000 Municipal agreement needs to be requested and executed to begin work.Town of Carrboro/Stephen RobinsonPage 2DCHCMPO May 2024