Orange County NC Website
10 <br /> <br /> Travis Myren said the site is currently at its maximum level of impervious surface allowed. <br /> Commissioner Portie-Ascott asked if local or state rules are guiding that. <br /> Cy Stober, Planning and Inspections Director, said these are local rules regarding <br />impervious surface. He said the Upper Eno Watershed could be 30% under state regulations, but <br />local regulation is 15%. <br /> <br />Slide #15 <br /> Chair Bedford asked if items were left in year one even if they are still an unknown. <br /> Travis Myren said once a path is determined for the justice facilities, any redundant <br />projects will be taken out of the plan. <br /> <br />Slide #16 <br />