Orange County NC Website
42 <br /> within the UDO. <br /> 6. The stream buffer areas denoted on the approved Preliminary Plat shall <br /> be left in an undisturbed, natural state. <br /> F. Drainage <br /> 1. The applicant shall submit a final Stormwater Management and Erosion <br /> Control Plan for approval by Orange County Erosion Control prior to the <br /> commencement of land disturbing activities. <br /> 2. Drainage easements shall be located on the Final Plat as required <br /> following review and approval of the stormwater management plan by <br /> Erosion Control staff. <br /> 3. Drainage culverts shall be sized and located appropriately, as required by <br /> NCDOT and Erosion Control, by a licensed North Carolina Professional <br /> Engineer. <br /> G. Emergency Services <br /> 1. The developer shall continue work between property owners, NCDOT and <br /> the Orange County Fire Marshal to ensure that adequate <br /> access/maintenance of fire water source(s) and suppression devices (e.g. <br /> fire hydrants) has been obtained. <br /> H. Parkland <br /> 1. At the time of recordation of the Final Plat, the applicant shall pay to <br /> Orange County $6,330.00 ($422.00 times 15 lots) payment-in-lieu-of- <br /> parkland dedication fee. <br /> I. Construction Waste <br /> 1. Per Orange County Ordinance, clean wood waste, scrap metal and <br /> corrugated cardboard and all present construction waste, must be <br /> recycled. <br /> 2. Per Orange County Ordinance, all haulers of construction waste must be <br /> properly licensed. <br /> 3. Prior to any demolition or construction activity on the site the applicant <br /> shall hold a pre-demolition/pre-construction conference with the County's <br /> Solid Waste staff. This may be the same meeting held with other <br /> development officials. <br /> J. Miscellaneous <br /> 1. The Final Plat shall contain a title block and vicinity map in accordance <br /> with the UDO. <br />