Orange County NC Website
31 <br /> require an Army Corps PCN 404/401 application for stream buffer impact and issuance <br /> of Orange County buffer impact authorization certificate for the planned stream crossing. <br /> Stormwater Management: <br /> The submitted materials indicate a level of development that could meet current UDO <br /> requirements specific to stormwater management. Five (5) permanent Stormwater <br /> Control Measures (SCMs) are proposed; specifically, "SCM #11", "SCM #2", "SCM #3", <br /> "SCM #4" and "SCM #5". Only the general locations and preliminary calculations for the <br /> proposed SCMs have been provided, with no supporting calculations. The project will <br /> need to meet applicable stormwater management requirements as outlined in Section <br /> 6.14 of the Orange County UDO and must be in general conformance with the North <br /> Carolina Stormwater Design Manual (i.e., Minimum Design Criteria). <br /> Conclusion: <br /> The Division has No Objections to the approval of the SUB application so long as a <br /> complete LDP application and supporting plans and calculations are submitted for review, <br /> processing, and approval prior to commencement of on-site Land-Disturbing Activity. As <br /> the project progresses, additional field observations, additional permitting by others (e.g., <br /> US Army Corps of Engineers, NC Department of Environmental Quality, NC Department <br /> of Transportation, etc.), additional buffers, setbacks, and/or additional Orange County <br /> review and permitting may apply beyond the proposed development as shown with this <br /> SUB application. <br /> C Dig itaIlysigned by Christopher J.Sandt,P.E. <br /> Christopher J. Sandt P.E. DN:cn=Christopher i San d4ail=sa Orange County,North Carolina, <br /> � ou=Engineering Division,email=csandt@orangecountyncgov,c=US <br /> Date:2024.02.28 15:31:49-05'00' <br /> Christopher Sandt, PE Date <br /> " e' � 2/28/24 <br /> Steve Kaltenbach Date <br /> Page 2 of 2 <br />