Browse
Search
Agenda - 06-04-2024; 5-c - Unified Development Ordinance Text Amendment – Regulatory Reform Compliance & Clarifications
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2024
>
Agenda - 06-04-2024 Business Meeting
>
Agenda - 06-04-2024; 5-c - Unified Development Ordinance Text Amendment – Regulatory Reform Compliance & Clarifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2024 10:28:21 AM
Creation date
5/31/2024 10:32:59 AM
Metadata
Fields
Template:
BOCC
Date
6/4/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-c
Document Relationships
Agenda for June 4, 2024 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2024\Agenda - 06-04-2024 Business Meeting
Minutes 06-04-2024 - Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2024
ORD-2024-012-An Ordinance amending the Orange County zoning atlas
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2024
ORD-2024-013-An Ordinance amending the Unified Development Ordinance of Orange County
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2024
ORD-2024-014-An Ordinance Amending the Unified Development Ordinance of Orange County
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2024
ORD-2024-015-Fiscal Year 2023-24 Budget Amendment #10
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2024
OTHER-2024-038-Statement Of Consistency of a Proposed Zoning Atlas Map Amendment with the Adopted Orange County 2030 Comprehensive Plan
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2024
OTHER-2024-039-Unified Development Ordinance Text Amendment – Regulatory Reform Compliance and Clarifications
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2024
OTHER-2024-040-Unified Development Ordinance Text Amendment – Tobacco and Hemp Retail Use
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2024
PRO-2024-011-National Gun Violence Awareness Day 2024 Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2024
RES-2024-032-Refund Release Resolution
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2024
RES-2024-033-A RESOLUTION BY THE COUNTY OF ORANGE, NORTH CAROLINA TO DIRECT THE EXPENDITURE OF OPIOID SETTLEMENT FUNDS
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2024
RES-2024-034-A RESOLUTION BY THE COUNTY OF ORANGE, NORTH CAROLINA TO DIRECT THE EXPENDITURE OF OPIOID SETTLEMENT FUNDS
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2024
RES-2024-035-Major Subdivision Preliminary Plat Application – Williams Glen
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 4: Overlay Zoning Districts30 <br /> Section 4.2:Watershed Protection <br /> TABLE 4.2.6: • (NON-RESIDENTIAL) <br /> DISTRICT IMPERVIOUS SURFACE/DETENTION POND REQUIREMENTS <br /> UNIV-CA 5-acre minimum lot size, with potential of up to five lots as small as two acres for lots of record September 1, <br /> CANE-CA 2015(University Lake)or October 19, 1999 (Cane Creek); AND <br /> 6% impervious surface limit. 1 , 2 <br /> U-ENO-CA 2-acre minimum lot size AND <br /> 6% impervious surface limit. [1], [2] <br /> 5-acre minimum lot size with potential of up to five lots as small as two acres for lots of record September 1, <br /> 2015(University Lake)or October 19, 1999 (Cane Creek); AND <br /> UNIV-PW 50% ISR for all fire stations and solid waste collection centers; AND <br /> CANE-PW 12% ISR for all other non-residential uses;AND <br /> on-site infiltration of the first inch of stormwater runoff;AND <br /> a limit of 1.0%of the watershed for non-residential use 139 acres in CANE-PW). [11, [2 <br /> 2-acre minimum lot size AND <br /> 50% ISR for all fire stations and solid waste collection centers; AND <br /> LITTLE-PW 12% ISR for all other non-residential uses; AND <br /> on-site infiltration of the first inch of stormwater runoff;AND <br /> a limit of 1.0%of the watershed for non-residential use 406 acres in LITTLE-PW). [1], 2 <br /> 70% ISR in Economic Development, Commercial and/or Commercial-Industrial Nodes as designated in the <br /> Land Use Element of the Comprehensive Plan (high-density option)with Stormwater Management Plans <br /> (SMPs)and/or Stormwater Control Measures (SCMs)if ISR exceeds 12%; AND <br /> 50% ISR for all fire stations and solid waste collection centers outside of Commercial and/or Commercial- <br /> U-ENO-PW Industrial Nodes as designated in the Land Use Element of the Comprehensive Plan, with Stormwater <br /> BACK-PW Management Plans(SMPs)and/or Stormwater Control Measures(SCMs)if ISR exceeds 12%; AND <br /> 12% ISR for all other non-residential uses outside of Commercial and/or Commercial-Industrial Nodes as <br /> designated in the Land Use Element of the Comprehensive Plan; AND <br /> on-site infiltration of the first inch of stormwater runoff;AND <br /> A limit of 1,151 acres of non-residential use throughout U-ENO-PW(5.0%)and 163 acres <br /> throughout BACK-PW 1% . [1], [2] <br /> 50% ISR for all fire stations and solid waste collection centers; AND <br /> HYCO-PW 12% ISR for all other non-residential uses;AND <br /> FLAT-PW on-site infiltration of the first inch of stormwater runoff;AND <br /> limit of 1%of the watershed for non-residential use 37 acres in HYCO-PW, 66 acres in FLAT-PW). 1 , 2 <br /> 70% impervious surface,with structural SCMs required when impervious surface exceeds: <br /> L-ENO-PW 24% (w/curb and gutter); or <br /> 36% w/o curb and gutter). [1], [2] <br /> HAW-PW 24% impervious surface limit. [1], [2] <br /> JORDAN-PW <br /> [1]Allowable impervious surface area may be modified in accordance with Section 4.2.8 of the UDO. <br /> [2] Regardless of the proposed amount of impervious surface area, a Stormwater Management Plan (SMP)and/or a Stormwater <br /> Control Measure (SCM)may be required in accordance with applicable local and State standards based on proposed land <br /> disturbance and/or a project exceeding impervious surface thresholds as identified herein. <br /> NOTE: Non-residential use impervious acreage limits in watershed with such limits are calculated using the actual amount of <br /> impervious surface for non-residential uses throughout the watershed, not by the overall number of acres of non-residential <br /> parcels located in a particular watershed. <br /> (A) Hillsborough Economic Development District <br /> (1) The Hillsborough Economic Development District is located within the Lower Eno <br /> - Unprotected watershed. Within the Hillsborough Economic Development <br /> District, as designated in the Land Use Element of the Comprehensive Plan, the <br /> maximum impervious surface ratio is 50%with Stormwater Control Measures <br /> (SCMs). <br /> Orange County, North Carolina—Unified Development Ordinance Page 4-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.