Browse
Search
Agenda - 06-04-2024; 8-h - Major Subdivision Preliminary Plat Application – Williams Glen
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2024
>
Agenda - 06-04-2024 Business Meeting
>
Agenda - 06-04-2024; 8-h - Major Subdivision Preliminary Plat Application – Williams Glen
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2024 10:32:05 AM
Creation date
5/31/2024 10:24:03 AM
Metadata
Fields
Template:
BOCC
Date
6/4/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-h
Document Relationships
Agenda for June 4, 2024 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2024\Agenda - 06-04-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 <br /> INTRODUCTION & SITE DESCRIPTION <br /> A detailed soil and site evaluation was performed on 15 lots proposed for the Lawrence Road <br /> Subdivision, Lawrence Road, Hillsborough, NC (Orange County PIN: 9883194355). Wood Soil <br /> Consultants, PLLC (WSC) was retained to perform a detailed soil and site evaluations of the 15 <br /> lots to determine if there is sufficient Provisionally Suitable soil for Conventional Type or Low- <br /> Profile Chamber systems for at minimum, a 4-bedroom home, ideally a 5-bedroom home. The <br /> study area had been partially evaluated in a November 21, 2021 Reconnaissance Soil & Site <br /> Evaluation performed by WSC. The property was evaluated in accordance with the "Laws and <br /> Rules for Sewage Treatment and Disposal Systems", amended December 6, 2018. <br /> The area is mostly open field with some woods on the eastern fringes of the study area and along <br /> southern boundary. <br /> INVESITGATION METHODOLOGY <br /> The field survey was conducted on December 4 and 6, 2023 by Michael G. Wood, LSS and <br /> Ethan T. Wood. Soil borings were advanced with hand-augers and soil color determined using a <br /> Munsell Soil Color Chart. Observations of the landscape as well as soil properties (depth, <br /> texture, structure, soil wetness, restrictive horizons, etc.) were recorded. Soil borings were <br /> described per the USDA-NRCS, Field Bookfor Describing and Sampling Soils, Version 3.0. Soil <br /> borings and site features are noted in Figure 1. <br /> FINDINGS <br /> Thirty (30) soil borings, two each on the 15 lots, were advanced, and their locations noted on <br /> Figure 1. The minimum bedroom capacity is provided in Table 1. <br /> Table 1. <br /> Lot# 4-Bedroom 5-Bedroom <br /> 1 X <br /> 2 X <br /> 3 X <br /> 4 X <br /> 5 X <br /> 6 X <br /> 7 X <br /> 8 X <br /> 9 X <br /> 10 X <br /> 11 X <br /> 12 X <br /> 13 X <br /> 14 X <br /> 15 X <br /> Lawrence Road Septic Suitability Report December 11, 2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.