Browse
Search
Agenda - 06-04-2024; 8-a - Minutes
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2024
>
Agenda - 06-04-2024 Business Meeting
>
Agenda - 06-04-2024; 8-a - Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2024 10:30:10 AM
Creation date
5/31/2024 10:20:42 AM
Metadata
Fields
Template:
BOCC
Date
6/4/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-a
Document Relationships
Agenda for June 4, 2024 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2024\Agenda - 06-04-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8 <br /> 1 Chair Bedford asked if the Cedar Grove Community Center was reduced from two wings <br /> 2 to one wing. <br /> 3 Travis Myren said it was reduced from two to one for programmatic reasons and to also <br /> 4 be mindful of the total cost. <br /> 5 Chair Bedford said that the Sheriff is reluctant to store evidence that far away so they will <br /> 6 get more into that. <br /> 7 Travis Myren said the wing would primarily be used for storage materials that are currently <br /> 8 in the environmental and ag center and those documents are long-term or permanent for retention <br /> 9 requirements. He said that is a building that could be raised for affordable housing or other county <br /> 10 needs and that storage has to be placed somewhere. <br /> 11 <br /> 12 Slide #12 <br /> FY2024-34 Recommended Capital Investment Plan <br /> Climate Change Mitigation Project Status <br /> i + <br /> Suppleuwnlal vaeattlen¢ation to Habitat for Huntanlly $55.004 In progress <br /> Habtat Rooftop Solar Habitat dor Humanly $190,9011 In progress home repair protects <br /> Rebuilding Together Grebn infrastructure andW'eatheriEatiPn of As Triangle $25.,000 In progress apprenticeship program dor Soled Sus[a nab Iy <br /> ' alulioaui $89-.158 In progress <br /> Food Waste Monitors Market Eno River Farmers $4,500 COMPLETED Orange County Schools <br /> Ffaborunyh U*ed <br /> Rooftop solar Church of Christ $19.090 In progress <br /> 293 Solar Project Town of Carrooro 549.575 In progress Rooftop wear 9rrkmy Rapust Church 549.038 In progress. <br /> Fleet Electrification Prujecl Town of Chapel HE $50,090 In progress Rooftop solar on Peach <br /> Aparvnenls EMP1044ERn-*nt $61.1523 In progress <br /> Solar Rood The Ar%Center $55,090 COMPLETED Installation of gardens,terrace <br /> Club Nova $37227 In progress <br /> anis greenhruse <br /> En issiun Reductions Thrwgh Chapel H1 Carrboro <br /> HVAC Replacements City Schools $275,975 In progress LED tight campus changerner CHCGS $94.014 In progress <br /> 54-panel solar panel pedestal Orange County <br /> with battery storage and EV schools S1E5,029 In;progress <br /> charging statimm <br /> ORANGE COUNTY <br /> P.C3FUr-H UIRQLINA <br /> 12 <br /> 13 <br /> 14 <br /> 15 <br /> 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.