Browse
Search
Agenda - 06-04-2024; 5-c - Unified Development Ordinance Text Amendment – Regulatory Reform Compliance & Clarifications
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2024
>
Agenda - 06-04-2024 Business Meeting
>
Agenda - 06-04-2024; 5-c - Unified Development Ordinance Text Amendment – Regulatory Reform Compliance & Clarifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2024 10:28:21 AM
Creation date
5/31/2024 10:18:21 AM
Metadata
Fields
Template:
BOCC
Date
6/4/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-c
Document Relationships
Agenda for June 4, 2024 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2024\Agenda - 06-04-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 2: Procedures24 <br /> Section 2.5: Site Plan Review <br /> Failure to meet the criteria for site plan approval listed herein, and/or to address all <br /> review comments solicited during plan review, will result in denial of the application. <br /> (F) If a plan is approved with conditions, no zoning authorization allowing Land-Disturbing <br /> Activity or subsequent building permit shall be issued until all conditions of approval have <br /> been met to the satisfaction of Orange County. <br /> (G) Site plan approval and the issuance of a Zoning Compliance Permit does not establish a <br /> vested right to develop the property should zoning regulations change subsequent to plan <br /> approval. <br /> 2.5.5 Vesting of Site Plan <br /> (A) At the option of the Applicant, a site plan may be vested for a period of not less than two <br /> nor more than five years. Multi-phased developments, as defined in NCGS 160D-108, <br /> shall be vested for a period of seven years from the time a site plan approval is granted <br /> for the initial phase of the multi-phased development. <br /> (B) To become vested, a site specific vesting plan must be approved by the Board of County <br /> Commissioners through either the normal project approval process if the Board of County <br /> Commissioners is the approval authority, or, in the case the Board of County <br /> Commissioners is not the normal approval authority, by the Board of County <br /> Commissioners after a legislative hearing. <br /> (1) Said legislative hearing shall follow the public notification procedures set forth in <br /> Section 2.8.7. <br /> (2) The Board of County Commissioners may approve the site specific vesting plan <br /> with such terms and conditions as may reasonably be necessary to protect the <br /> public health, safety, and welfare. Such conditional approval shall result in a <br /> vested right. Failure to abide by such terms and conditions shall result in a <br /> forfeiture of vested rights. <br /> (C) An approved site specific vesting plan shall contain the following statement: "Approval of <br /> this plan establishes a zoning vested right under NCGS 160D-108. Unless terminated at <br /> an earlier date, the zoning right shall be valid until " <br /> (D) The site specific vesting plan for a project which requires the preparation of an <br /> Environmental Impact Statement(EIS) in accordance with Section 6.16 of this Ordinance <br /> shall not be approved until the EIS has been made available for public review, and has <br /> been presented to the Board of County Commissioners in accordance with Section 2.23 <br /> of this Ordinance. <br /> 2.5.6 Performance Guarantees <br /> (A) If a Performance Guarantee is required, the provisions of Section 2.27 of this Ordinance <br /> shall apply. <br /> 2.5.7 Additional Requirements for Overlay Districts <br /> (A) Efland-Cheeks Highway 70 Corridor Overlay District <br /> (1) Approval Requirements <br /> Within the Efland-Cheeks Highway 70 Corridor Overlay District (ECOD), no <br /> construction activity shall begin nor shall any conversion of existing single-family <br /> residence to a non-residential land use, excavation, soil removal, grading or <br /> disturbance of vegetation including trees, Land-Disturbing Activity associated <br /> with a non-residential land use, be commenced, nor any sign erected until such <br /> time as a site plan has been approved and a permit issued by the Planning <br /> Director in accordance with this Section and Section 2.4 of this Ordinance. <br /> (B) Efland Interstate Overlay District <br /> Orange County, North Carolina—Unified Development Ordinance Page 2-12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.