Browse
Search
Agenda - 06-04-2024; 5-b - Zoning Atlas Amendment – 3009 Forrest Ave., Efland, Cheeks Township
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2024
>
Agenda - 06-04-2024 Business Meeting
>
Agenda - 06-04-2024; 5-b - Zoning Atlas Amendment – 3009 Forrest Ave., Efland, Cheeks Township
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2024 10:27:48 AM
Creation date
5/31/2024 10:16:52 AM
Metadata
Fields
Template:
BOCC
Date
6/4/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-b
Document Relationships
Agenda for June 4, 2024 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2024\Agenda - 06-04-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
53 <br /> Based on the submitted materials for the proposed development, the project could meet <br /> the basic Erosion and Sedimentation Control requirements as outlined in Section 6.15 of <br /> the Orange County UDO and could be developed as generally proposed. <br /> Stormwater Management: <br /> The project parcel is located in the Upper Eno Protected (Neuse River Basin) Overlay <br /> District and is therefore subject to compliance with the Neuse Nutrient Management <br /> Strategy. There are no known Special Flood Hazard Areas (SFHAs) located on the <br /> project parcel. Based on the submitted materials for the proposed development, the <br /> project could meet the basic Stormwater Management requirements as outlined in <br /> Section 6.14 of the Orange County UDO. While preliminary at this stage of Orange County <br /> review, the proposal is under the threshold for stormwater review. <br /> Conclusion: <br /> The Division has No Objections to the approval of the rezoning request so long as a <br /> complete LDP application and supporting plans and calculations are submitted to Orange <br /> County for review and approval prior to commencement of on-site Land-Disturbing <br /> Activity, if thresholds were to be reached or exceeded with any future plan changes. As <br /> the project progresses, additional field observations, and/or permitting by others (e.g., US <br /> Army Corps of Engineers, NC Department of Environmental Quality, NC Department of <br /> Transportation, etc.), additional buffers, setbacks, and/or additional Orange County <br /> review and permitting may apply beyond the proposed development as shown with this <br /> rezoning request. <br /> RE <br /> Digitally signed by Christopher J.Sandt,P.E. <br /> Christopher I Sandt, RE. ou:cn=Christopher J.Sandt,P.E.,oandt@oe County,North <br /> .gov,c=U <br /> ou=Engineering Division,email=csandt@orangecountync.gov,c=US <br /> Date:2024.05.0616:44:37-04'00' <br /> Christopher Sandt, PE Date <br /> 5/6/2024 <br /> Steve Kaltenbach Date <br /> Page 2of2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.