Browse
Search
Agenda - 06-04-2024; 5-b - Zoning Atlas Amendment – 3009 Forrest Ave., Efland, Cheeks Township
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2024
>
Agenda - 06-04-2024 Business Meeting
>
Agenda - 06-04-2024; 5-b - Zoning Atlas Amendment – 3009 Forrest Ave., Efland, Cheeks Township
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2024 10:27:48 AM
Creation date
5/31/2024 10:16:52 AM
Metadata
Fields
Template:
BOCC
Date
6/4/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-b
Document Relationships
Agenda for June 4, 2024 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2024\Agenda - 06-04-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br /> ii. The changed, or changing, conditions (if any) that makes the proposed amendment <br /> reasonable necessary to promote the public health, safety, and general welfare. <br /> iii. How the proposed amendment is consistent with, or carries out the intent and purpose of <br /> the adopted Orange County Comprehensive Plan, or part thereof. <br /> Q The filing fee per the adopted Orange County fee schedule. <br /> Conditional District Rezoning Application <br /> Based on Section 2.9.2 (C) of the Unified Development Ordinance (UDO): <br /> ❑A site plan prepared in accordance with the provisions of Section 2.5 of the UDO. Applications <br /> for a Master Plan Development (MPD) Conditional District (CD) shall adhere to the site plan <br /> preparation requirements outlined in Section 6.7 of the UDO, <br /> ❑All CD applications, regardless of type, shall include a detailed landscape plan showing the <br /> location of on-site significant trees; proposed screening, buffers, and landscaping; and any <br /> proposed treatment of any existing natural features. <br /> ❑A detailed description of the proposed use of property including an outline of the proposed <br /> development. This will include a detailed summary of proposed utility services, The utility service <br /> plan for applications for a Home Park (HP) CD shall specify if the proposed services are temporary <br /> or permanent connections. <br /> ❑A detailed traffic survey, regardless of estimated daily trips, prepared in accordance with North <br /> Carolina Department of Transportation requirements and Section 6.17 of the UDO. <br /> El The appropriate environmental document(s) prepared in accordance with Section 6.96 of the <br /> UDO. <br /> ❑A schedule of construction of all elements of the proposal. <br /> ❑ Other information identified during the pre-application conference deemed essential to <br /> demonstrate the project's compliance with these regulations. <br /> The filing fee per the adopted Orange County fee schedule. <br /> Certification and Signatures <br /> I (we), the undersigned, have been made aware of the process for the review and action associated <br /> with a UDO Zoning Atlas Amendment application and understand only completed applications, <br /> containing all information required by the Orange County UDO, shall be reviewed and acted upon by <br /> the County. Further I (we) understand that any assistance I (we) may receive from County staff in <br /> preparing this application in no way guarantees a favorable recommendation by staff on the merits of <br /> this proposal nor does it guarantee an approval of the proposed atlas amendment by the County. <br /> Efland Ruritan Club Anthony Cecil <br /> Owner Signature(s) Applicant Signature (if different from owner) <br /> 02-13-2024 02-13-2024 <br /> Date I,3_� date 2 <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.