Orange County NC Website
Comments: 31 <br /> Goal 5: Efficient and effective drainage, stormwater, floodplain management, and erosion <br /> control systems. yes <br /> Comments: ny necessary measures installed as needed and required over the years. <br /> Objective EC-1: <br /> Continue to use Best Management Practices (BMP's) for stormwater control, as outlined <br /> within the Orange County Unified Development Ordinance, to minimize potential adverse n/a <br /> impacts on the water quality. <br /> Comments: <br /> Objective EC-3: <br /> Prohibit activities that adversely affect surface and ground water systems that may serve or n/a <br /> do serve as a public water supply. <br /> Comments: <br /> Objective EC-4: <br /> Use low-impact stormwater design principles when developing new or retrofitting existing n/a <br /> drainage systems that do not functionally approximate the natural drainage pattern. <br /> Comments: <br /> Objective EC-5: <br /> Minimize sedimentation and erosion to reduce the transport of sediment and pollutants to n/a <br /> surface waters. <br /> Comments: <br /> Objective EC-6: <br /> Protect and maintain the existing aquatic, riparian and terrestrial habitats-of fish and n/a <br /> wildlife. <br /> Comments: <br /> Goal 6: Less solid waste per capita with cost effective and environmentally responsible <br /> disposal and management. n/a <br /> Comments: <br /> Objective SW-2: <br /> Encourage the recycling of solid waste, including but not limited to the preference for n/a <br /> deconstruction practices over demolition, to minimize waste disposed of in landfills. <br /> Comments: <br /> 14 <br />