Orange County NC Website
Determining 2030 Comprehensive Plan Consistency <br /> (To be completed for Zoning Atlas Amendments and Special Use Permits) ORANGE <br /> COUNTY <br /> NORTH CAROLINA <br /> Applicable Adopted Plans <br /> Is the project subject to the Hillsborough-Orange Central Orange Coordinated Area —Y/N <br /> (COCA) Land Use Plan? (Y/N) If Yes, include comments. <br /> Comments: <br /> Is the project subject to the Orange County-Chapel Hill-Carrboro Joint Planning Land -Y/N <br /> Use Plan? (Y/N) If Yes, include comments. <br /> Comments: <br /> Is the requested zoning district indicated for the Land Use Classification, as shown on Y/N-- <br /> the <br /> /N_the chart in Appendix F of the 2030 Comprehensive Plan? If No, include comments. <br /> Comments: <br /> Does the proposed project fit with the written text of the Land Use Classification, as <br /> found in Article 10 of the LIDO, and Chapter 5 and Appendix F of the 2030 Y/P� <br /> Comprehensive Plan. If No, include comments. <br /> Comments: <br /> Does the proposed project require a Future Land Use Map (FLUM) Amendment? If Yes, <br /> include comments on the proposed Land Use Classification and any pertinent Land Use -WN <br /> Category Locational Criteria, Appendix G of the 2030 Comprehensive Plan. <br /> Comments: <br /> Potable Water and Wastewater <br /> Does the project require Public Utilities (i.e. Water and/or Sewer)? (Y/N) Y/N <br /> Comments: <br /> already existing <br /> If Public Utilities are required, is the project located within a Primary Service Area as <br /> identified on the Water and Sewer Management, Planning and Boundary Agreement Y/N-- <br /> Map? (Y/N) If No, include comments. <br /> 1 <br />