Browse
Search
2024-276-E-AMS-Otis Elevator-Replace power unit in the elevator at WCOB
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-276-E-AMS-Otis Elevator-Replace power unit in the elevator at WCOB
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2024 9:31:48 AM
Creation date
5/28/2024 9:31:42 AM
Metadata
Fields
Template:
Contract
Date
5/8/2024
Contract Starting Date
5/8/2024
Contract Ending Date
5/14/2024
Contract Document Type
Contract
Amount
$32,423.47
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revised 01/24 <br />1 <br /> [Departmental Use Only] <br /> TITLE WCOB Elevator Repair <br /> FY 2023/2024 <br />NORTH CAROLINA <br /> SERVICES AGREEMENT NO RFP/RFQ <br /> <br />ORANGE COUNTY <br /> <br /> This Services Agreement (hereinafter “Agreement”), made and entered into this 8th day of <br />May, 2024, (“Effective Date”) by and between Orange County, North Carolina a political <br />subdivision of the State of North Carolina (hereinafter, the "County") and Otis Elevator <br />Company, (hereinafter, the "Provider"). <br /> <br />WITNESSETH: <br /> <br /> That the County and Provider, for the consideration herein named, do hereby agree as <br />follows: <br /> <br />1. Services <br /> <br />a. Scope of Work. <br /> <br />i) This Agreement is for services to be rendered by Provider to County with respect <br />to (insert type of project): Emergency Work:The existing power unit will be <br />replaced with a new power unit. The new power unit consists of a positive <br />displacement pump, motor, integral 4-coil control valve, oil tank and muffler. The <br />pump and motor are submerged and are mounted to the tank with rubber isolators to <br />reduce vibration and noise. A muffler is provided to dissipate pulsations and noise <br />from the flow of hydraulic fluid. The valve consists of up, up leveling, down and <br />down leveling controls along with manual lowering and a pressure relief valve. <br />ii) Oil disposal is not included. If any additional work is needed, we will provide <br />another proposal. The scope proposed herein represents the entire scope that Otis is <br />contracted for, if additional work is required by others to allow for completion of <br />this work and/or for the inspection to occur, that work is not included. Tax is not <br />included. Material provided shall be installed in accordance with the ASME A17.1 <br />Safety Code for Elevators and Escalators. The customer will be responsible for <br />paying local inspection fees if applicable. A representative will contact you to <br />schedule the work. All work will be performed during regular working days and <br />hours of the Elevator Trade unless otherwise specified above. Please see attached <br />proposal dated: 04/30/24 <br /> <br />iii) By executing this Agreement, the Provider represents and agrees that Provider is <br />qualified to perform and fully capable of performing and providing the services <br />required or necessary under this Agreement in a fully competent, professional and <br />timely manner. <br /> <br />iv) Time is of the essence with respect to this Agreement. <br /> <br />DocuSign Envelope ID: A7EF7A7B-5141-4367-8BA2-A2D7BAABCFE3
The URL can be used to link to this page
Your browser does not support the video tag.