Browse
Search
2024-257-E-Planning Dept-HGS, LLC T-A RES Environmental Operating Company-Change Order No. 1 Gravelly Hill MS Stormwater Wetland Retrofit Project
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-257-E-Planning Dept-HGS, LLC T-A RES Environmental Operating Company-Change Order No. 1 Gravelly Hill MS Stormwater Wetland Retrofit Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2024 9:21:16 AM
Creation date
5/28/2024 9:21:13 AM
Metadata
Fields
Template:
Contract
Date
4/29/2024
Contract Starting Date
4/29/2024
Contract Ending Date
5/2/2024
Contract Document Type
Contract
Amount
$0.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CHANGE ORDER – Option A – Sod Placement <br /> <br />Date: 4/19/2024 <br />Project: Gravelly Hill Middle School Stormwater Wetland Retrofit <br />Change Order #: 1 <br />Owner: Orange County, North Carolina <br />Contractor: HGS, LLC T/A RES Environmental Operating Company, LLC <br />Engineer: Timmons Group <br /> <br />TYPE OF CHANGE ORDER (Check one:) Standard Change Order <br /> X Unforeseen Site Condition (Justification in email) <br /> Emergency (Authorization attached) <br /> Substantial (Authorization attached) <br />Description of Change: <br /> <br />The following Proposed Change Order(s) are incorporated into the Contract by reference: <br /> <br />Line No. Summary Description: Qty Units Price <br />5 Flared End Section and End Walls -2 EA -$6,799.76 <br />5 Flared End and End Walls (Restocking Fee 10%) +0.2 EA +$679.98 <br />6 15” RCP Class III Gasketed -82 LF -$8,019.06 <br />6 15” RCP Class III Gasketed (Restocking Fee 25%) +20.5 LF +$2,004.77 <br />CO-1-A Change Order Option A – Sod Placement 1 LS +$12,134.07 <br /> <br />Original Contract Amount: $286,820.84 <br />Previous Change Order(s): $0 <br />Contract Amount Prior to this Change Order: $286,820.84 <br />Amount of this Change Order: $0 <br /> <br />New Contract Amount Including this Change Order: $286,820.84 <br /> <br />Contractor agrees to perform the above-described work in accordance with the above terms and in compliance with <br />applicable sections of the Project documents. <br /> <br /> <br /> <br /> <br />Exhibit BDocuSign Envelope ID: F48365FE-0490-4302-A2A1-A0E5DF090AEA
The URL can be used to link to this page
Your browser does not support the video tag.