Browse
Search
2024-230-E-Planning Dept-Town of Carrboro-Planning Zoning and Inspections
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-230-E-Planning Dept-Town of Carrboro-Planning Zoning and Inspections
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2024 9:05:47 AM
Creation date
5/28/2024 9:05:04 AM
Metadata
Fields
Template:
Contract
Date
4/16/2024
Contract Starting Date
4/16/2024
Contract Ending Date
4/22/2024
Contract Document Type
Contract
Amount
$81,132.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P a g e 12 o f 22 <br /> <br />Also, what are the <br />demographics of <br />the area where <br />your project takes <br />place? <br /> <br />Does your project <br />help to address <br />any racial <br />disparities in the <br />location it is <br />proposed for? <br /> <br />Please list any <br />data sources used <br />and show the <br />steps of any <br />calculations: <br />rainfall and reducing the total volume of annual runoff from the associated <br />roof area by 60%. It will help mitigate the urban heat island effect by <br />removing heat from the air through evapotranspiration, and will provide <br />aesthetic value and improve quality of life, as interaction with nature has <br />been shown to benefit physical and mental health and productivity. <br /> <br />The 203 Project will be located at 203 S. Greensboro Street. The median <br />annual household income for the census tract in this location is $63,000/year, <br />which is slightly higher than the median annual household income for the <br />Town of Carrboro overall, which is approximately $58,700/year. <br />Source: American Community Survey, <br />https://www.arcgis.com/apps/mapviewer/index.html?layers=45ede6d6ff7e4c <br />bbbffa60d34227e462. <br /> <br />The 203 Project is projected to include 29 new jobs in downtown Carrboro <br />and 72,000 to 101,000 in expenditures for downtown businesses. Average <br />salaries associated with Skills Development Center (12-15 employees <br />directly, + partner agencies) is approximately $40,000. <br /> <br />Additional demographics of the project location: <br />Race and Hispanic Origin <br />Percentage <br />of Town <br />Population <br />Percentage <br />of Project <br />Location, <br />Census <br />Tract <br />107.05 <br />White alone, not Hispanic 68% 70% <br />Black or African American alone, <br />not Hispanic 11% 12% <br />Asian alone, not Hispanic 9% 1% <br />American Indian and Alaska Native <br />alone, not Hispanic 0.30% 3% <br />Native Hawaiian and Other Pacific <br />Islander, not Hispanic 0% 0% <br />Two or more races, not Hispanic 4% 3% <br />Hispanic or Latino 7% 10% <br />Some other race, not Hispanic 0% 0.5% <br />Source: Census.gov <br />(https://www.census.gov/quickfacts/fact/table/carrborotownnorthcarolina/PO <br />P060210) <br />American Community Survey, <br />https://www.arcgis.com/apps/mapviewer/index.html?layers=23ab8028f1784d <br />e4b0810104cd5d1c8f <br /> <br />DocuSign Envelope ID: 08DD74BE-CE96-4D90-9C72-8BD18C25E2E7
The URL can be used to link to this page
Your browser does not support the video tag.