Browse
Search
2024-230-E-Planning Dept-Town of Carrboro-Planning Zoning and Inspections
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-230-E-Planning Dept-Town of Carrboro-Planning Zoning and Inspections
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2024 9:05:47 AM
Creation date
5/28/2024 9:05:04 AM
Metadata
Fields
Template:
Contract
Date
4/16/2024
Contract Starting Date
4/16/2024
Contract Ending Date
4/22/2024
Contract Document Type
Contract
Amount
$81,132.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P a g e 9 o f 22 <br /> <br />The building will occupy approximately 50,000 gross square feet <br />with parking, divided as follows: <br /> <br />Use Approximate Size <br />(Square Feet) <br />Town of Carrboro <br />program/office space <br />6,351 <br />Associated/Town functions <br />(WCOM radio, Virtual Justice <br />Center, Teen Space, Black Box <br />Theater) <br />9,697 <br />Orange County Southern <br />Branch Library (with seed <br />library) <br />9,718 <br />Orange County Skills <br />Development Center <br />9,229 <br /> <br />In addition, there are 1,917 square feet shared between the Town of <br />Carrboro and the Orange County Skills Development Center, as <br />well as 13,637 square feet associated with circulation, building <br />services, and public toilets. The building will be designed to meet <br />the United States Green Building Council Leadership in Energy and <br />Environmental Design (USGBC LEED) Gold equivalent <br />performance, emphasizing high efficiency and low energy impact. <br /> <br />The Town is requesting funds to construct a solar photovoltaic array <br />on the building’s west roof as well as a green roof in a separate area. <br />The solar photovoltaic array will produce 102,700 kWh/year and <br />the green roof will be designed as a tray-type vegetated roof <br />assembly. All residents of Carrboro (21,230) and Orange County <br />(148,476) will benefit from the project’s greenhouse gas emissions <br />reductions resulting from reductions in electricity usage as well as <br />carbon sequestration. The solar array and green roof will provide a <br />visible example of the Town and County commitment to climate <br />action and sustainability in a prominent, highly-trafficked location <br />in downtown Carrboro. <br /> <br />8. Please choose the best <br />description for the type of <br />project: <br /> <br />☒ Infrastructure/Clean Tech: New <br />☐ Infrastructure/Clean Tech: Repair <br />☐ Infrastructure/Clean Tech: Replacement <br />☐ Communication/Education <br />☐ Natural Systems Management/Restoration <br />☐ Circular Economy/Waste reduction <br />☐ Analysis/Plan <br />☐ Other (Please describe): <br />DocuSign Envelope ID: 08DD74BE-CE96-4D90-9C72-8BD18C25E2E7
The URL can be used to link to this page
Your browser does not support the video tag.