Browse
Search
2024-227-E-AMS-MBP Carolinas-Emergency Services – Window Testing after GC Repaired
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-227-E-AMS-MBP Carolinas-Emergency Services – Window Testing after GC Repaired
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2024 9:03:17 AM
Creation date
5/28/2024 9:03:14 AM
Metadata
Fields
Template:
Contract
Date
4/17/2024
Contract Starting Date
4/17/2024
Contract Ending Date
4/22/2024
Contract Document Type
Contract
Amount
$76,200.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />MBP Facility Solutions, LLC <br />4700 Falls of Neuse Road, Suite 370 | Raleigh, North Carolina 27609 | 919-875-0124 - Local | www.mbpce.com <br /> <br />March 27, 2024 <br />Orange County Government <br />Asset Management Services <br />300 West Tryon Street, Bldg B, 3rd Floor Office 10 <br />Hillsborough, NC 27278 <br /> <br />Attention: Angel Barnes, Capital Projects Manager <br />Reference: Orange County Emergency Services Center – ES Moisture Cx & Add <br />Proposal for Additional Services <br /> <br />Dear Ms. Barnes, <br /> <br />MBP Facility Solutions, LLC (MBP-FS) is submitting this proposal to provide additional services to <br />Orange County (the “County” or “Client”) for the ES Moisture Cx & Add project at the Orange County <br />Emergency Services Center (the “Project”). These additional services include water infiltration testing <br />of two windows. Testing will be conducted by High Performance Building Solutions (HPBS). <br />SCOPE OF WORK (SOW) <br />MBP will subcontract with HPBS to complete the scope of work. Two windows on the first floor will be <br />tested for water infiltration following AAMA 501.2 (Quality Assurance and Diagnostic Water Leakage <br />Field Check of Installed Storefronts, Curtain Walls, and Sloped Glazing Systems). <br />The test will cover the edge of the glass surface, horizontal and vertical intersections of the frame and <br />the transition from the window assembly to the wall assembly. The interior gypsum should be removed <br />so any moisture intrusion is visible during the test. <br />HPBS will remove the exterior screen assembly, providing the Owner can unlock the exterior screen. <br />HPBS will remove the remaining interior gypsum around the windows to be tested. <br />A report will describe observations and findings of the existing conditions including documenting air <br />leakage and bulk water pathways in the building envelope system around the window assembly. <br />Proposal does not include replacement or repair of any gypsum removed during testing. <br />COMPENSATION <br />MBP-FS will provide the additional scope of work outlined in this Proposal for the fixed price amount of <br />$7,700.00. <br />ADDITIONAL SERVICES <br />Services not expressly identified in this Proposal are not included in the Proposal. Additional services <br />may be provided upon mutual agreement of the parties. <br /> <br />DocuSign Envelope ID: 594FD85F-3D63-4A7D-B4E4-C2EB40B72D60
The URL can be used to link to this page
Your browser does not support the video tag.