Browse
Search
2024-226-E-Emergency Svc-Cecil Holcomb Renovations-Hazard Mitigation Grant Acquisition Asbestos Abatement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-226-E-Emergency Svc-Cecil Holcomb Renovations-Hazard Mitigation Grant Acquisition Asbestos Abatement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2024 9:02:47 AM
Creation date
5/28/2024 9:02:42 AM
Metadata
Fields
Template:
Contract
Date
4/13/2024
Contract Starting Date
4/13/2024
Contract Ending Date
4/23/2024
Contract Document Type
Contract
Amount
$13,500.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br />PROPOSAL <br />FROM: <br /> <br />Cecil Holcomb Renovations Inc. Page No. 1 <br />8315-La Matisse Road Proposal No. 1 <br />Raleigh, N.C.27615 Sheet No. 1 <br />Phone 919-876-4060 Date: 2-15-24 <br />Fax 919-844-8339 <br /> <br />Proposal Submitted To: Work To Be Performed At: <br />Name: Orange County Emergency Services Street: 503 Brandywine Road <br />Street: P. O. Box 8181 City: Chapel Hill State: NC <br />City: Hillsborough Date of Plans: 2-8-24 <br />State: NC 27278 Architect: Sarah Pickhardt, Division Chief <br />Phone: 919-245-6135 Email: spickhardt@orangecountync.gov <br /> <br />We will furnish all the required materials, which we guarantee will be as specified, and we wi ll perform all the labor <br />required for the completion of <br /> <br />Remove and dispose of 1600SF texture ceilings, 400SF floor mastic, 1 sink, 10SF exterior caulk, and 5SF chimney <br />caulk. <br />Asbestos removal procedures will mee tor exceed all applicable federal, sta te, local, EPA and OSHA regulations to <br />date. <br />We will properly dispose of all asbestos contaminated waste at an approved landfill in compliance with all DOT, <br />OSHA and EPA regulations. <br /> <br />The above work to be performed in accordance with the drawings and specifications submitted for above work and <br />completed in a workmanlike manner for the sum of <br /> Dollars ($$13,500.00). <br /> <br />With payments to be made as follows: Due upon completion, over 30 days - add 1.5% per month. Retainage will <br />be paid no more than 45 days after demolition final inspection. <br /> <br />Changes in the above specifications may be made only upon written agreement, and extra charges will be made. <br />All agreements are contingent upon strikes, accidents or delays beyond our control. Our workers are fully covered <br />by Workmen’s Compensation and Public Liability Insurance. We retain the rights to all salvage materials. This <br />proposal may be withdrawn by us at any time before acceptance. You will be required to pay any legal fees that <br />arise due to failure of payment in full. The project will be consid ered completed once it has passed inspection by the <br />local inspection department. <br />Respectfully submitted <br /> Cecil Holcomb, President <br />ACCEPTANCE <br />The above prices, specifications and conditions are accepted. Payments will be made as set forth above. <br />Accepted : <br />Signature: Signature: <br />Date: Signature: <br /> <br /> <br /> <br />DocuSign Envelope ID: AF6A3CC8-BE96-4AFD-8BE5-1028C0E0FE78 <br />4/23/2024
The URL can be used to link to this page
Your browser does not support the video tag.