Orange County NC Website
18 <br />Revised 01/24 <br />Attachment C - Format of Total Project Cost Estimate <br />ORANGE COUNTY <br />Attachment C--- Project Cost Estimate <br />PROJECT <br />IDENTIFICATION: <br />PROJECT CITY or LOCATION: <br />(Definitions/explanations are provided on pg 2 to assist in completion of this <br />form.) <br />CURRENT ESTIMATED CONSTRUCTION COSTS QTY UNIT COST PER UNIT TOTAL <br /> <br />A.Site Preparation <br />1. Demolition $0 <br />2. Site Work $0 <br />B.Construction <br />1. Utility Services $0 <br />2. Building Construction (new space) $0 <br />3. Building Construction (existing) $0 <br />4. Plumbing (new space) $0 <br />5. HVAC (new space) $0 <br />6. Electrical (Includes TV & Radio Studio) $0 <br />7. Fire Supression and Alarm Systems $0 <br />8. Telephone, Data, Video $0 <br />9. Associated Construction Costs $0 <br />10. Other: $0 <br />C.Equipment <br />1. Fixed $0 <br />2. Moveable $0 <br />ESTIMATED CONSTRUCTION COSTS $0 <br />Items below may be calculated by percentage or lump sum. If using lump sum, make entry in $ field. <br />DESIGN FEE %(% of Estimated Construction Costs)$0 <br />PRECONSTRUCTION <br />COSTS %(% of Estimated Construction Costs)$0 <br />CONTINGENCIES %(% of Estimated Construction Costs)$0 <br />ESTIMATED COSTS (% of Estimated Construction Costs + Contingencies + Design Fee)$0 <br />Escalation = percent per month multiplied by number of months <br />(From Est. Date to mid-point of construction) = months % per month <br />ESCALATION COST INCREASE (Total of Estimated Costs x Escalation %)$0 <br />ESTIMATED TOTAL PROJECT COSTS (Estimated Costs + Escalation Cost Increase if any)$0 <br />APPROVED BY: _______________________________________TITLE DATE <br />DocuSign Envelope ID: 0FA76812-3820-422E-B2FD-E4BC6DE9F278