Browse
Search
2024-210-E-AMS-Smith Sinnett Architecture-Design for CGCC Flooring
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-210-E-AMS-Smith Sinnett Architecture-Design for CGCC Flooring
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2024 8:48:35 AM
Creation date
5/28/2024 8:48:25 AM
Metadata
Fields
Template:
Contract
Date
3/20/2024
Contract Starting Date
3/20/2024
Contract Ending Date
4/8/2024
Contract Document Type
Contract
Amount
$69,581.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19 <br />Revised 01/24 <br />DEFINITIONS <br />Item on Form Definition <br />CURRENT ESTIMATED CONSTRUCTION COST <br />Attach basis and justification for estimate. Include description, quantities, units, <br />special features, similar cost on recent projects, etc. <br />A. 1. Demolition Includes but may not be limited to lead or asbestos testing and removal, building or <br />interior space demolition in whole or part. <br />A. 2. Site Work Includes but may not be limited to grading, excavating, poor soils or rock removal, <br />utilities relocation, roads, walks, parking, streambank repairs, stormwater <br />management, retaining walls, rainwater harvesting systems, landscaping. <br />B. 1. Utility Services Attach explanation of any special building, mechanical, or electrical service <br />requirements with appropriate distance to existing buildings, water, gas, electrical or <br />other utility service. <br />B. 9. Associated Construction Costs Includes but may not be limited to construction fire alarm testing, utility shut downs, <br />utilities, signage, security, displaced parking, staging, lock cores, keys, permits. <br />B. 10. Other List other signficant sources of cost not included elsewhere. Additional lines may be <br />added if needed. <br />PRECONSTRUCTION <br />COSTS <br />Includes but may not be limited to land surveys, lead/asbestos surveys, <br />environmental assessments, copying, postage, costs of print advertising, and <br />destructive testing. For CM at Risk, preconstruction costs are consistent with the <br />requirements of the preconstruction services agreement. <br />CONTINGENCIES Unanticipated or unforseen conditions including but not limited to design error and <br />omissions, concealed site conditions, utility conflicts, and extended overhead <br />resulting from weather or other delay. <br />DocuSign Envelope ID: 24C23513-67DE-4E6D-A730-E6E3EF76B03F
The URL can be used to link to this page
Your browser does not support the video tag.