Browse
Search
2024-210-E-AMS-Smith Sinnett Architecture-Design for CGCC Flooring
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-210-E-AMS-Smith Sinnett Architecture-Design for CGCC Flooring
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2024 8:48:35 AM
Creation date
5/28/2024 8:48:25 AM
Metadata
Fields
Template:
Contract
Date
3/20/2024
Contract Starting Date
3/20/2024
Contract Ending Date
4/8/2024
Contract Document Type
Contract
Amount
$69,581.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
18 <br />Revised 01/24 <br />Attachment C - Format of Total Project Cost Estimate <br />ORANGE COUNTY <br />Attachment C--- Project Cost Estimate <br />PROJECT <br />IDENTIFICATION: <br />PROJECT CITY or LOCATION: <br />(Definitions/explanations are provided on pg 2 to assist in completion of this <br />form.) <br />CURRENT ESTIMATED CONSTRUCTION COSTS QTY UNIT COST PER UNIT TOTAL <br /> <br />A.Site Preparation <br />1. Demolition $0 <br />2. Site Work $0 <br />B.Construction <br />1. Utility Services $0 <br />2. Building Construction (new space) $0 <br />3. Building Construction (existing) $0 <br />4. Plumbing (new space) $0 <br />5. HVAC (new space) $0 <br />6. Electrical (Includes TV & Radio Studio) $0 <br />7. Fire Supression and Alarm Systems $0 <br />8. Telephone, Data, Video $0 <br />9. Associated Construction Costs $0 <br />10. Other: $0 <br />C.Equipment <br />1. Fixed $0 <br />2. Moveable $0 <br />ESTIMATED CONSTRUCTION COSTS $0 <br />Items below may be calculated by percentage or lump sum. If using lump sum, make entry in $ field. <br />DESIGN FEE %(% of Estimated Construction Costs)$0 <br />PRECONSTRUCTION <br />COSTS %(% of Estimated Construction Costs)$0 <br />CONTINGENCIES %(% of Estimated Construction Costs)$0 <br />ESTIMATED COSTS (% of Estimated Construction Costs + Contingencies + Design Fee)$0 <br />Escalation = percent per month multiplied by number of months <br />(From Est. Date to mid-point of construction) = months % per month <br />ESCALATION COST INCREASE (Total of Estimated Costs x Escalation %)$0 <br />ESTIMATED TOTAL PROJECT COSTS (Estimated Costs + Escalation Cost Increase if any)$0 <br />APPROVED BY: _______________________________________TITLE DATE <br />DocuSign Envelope ID: 24C23513-67DE-4E6D-A730-E6E3EF76B03F
The URL can be used to link to this page
Your browser does not support the video tag.