Browse
Search
2024-193-E-AMS-Greer and Associates-Whitted Signage
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-193-E-AMS-Greer and Associates-Whitted Signage
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2024 8:38:21 AM
Creation date
5/28/2024 8:38:16 AM
Metadata
Fields
Template:
Contract
Date
3/26/2024
Contract Starting Date
3/26/2024
Contract Ending Date
3/26/2024
Contract Document Type
Contract
Amount
$21,840.21
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
This is only for us to apply and process your sign permit that is required by <br /> the jurisdiction your project is located in. <br />B) Additional fees: <br />Town Assessed Permit Fees_$ TBD** <br /> * This is the pass-through cost that the town charges us for all permitting, review, and inspections. <br />Total charges will be added on the final bill once assessed by the town.* <br />2.1 Permit Fee - <br />3 811 Call-in, Mark, Flags 1 $185.00 $185.00 $185.00 <br />3.1 811 Call-in - <br />4 Installation Mobilization Fee 2 $137.375 $137.375 $274.75 <br />4.1 Installation Mobilization - Local - <br />5 Order Processing Fee 1 $39.95 $39.95 $39.95 <br />5.1 Order Processing Fee - <br />Subtotal:$10,128.90 <br />Taxes:$759.67 <br />Grand Total:$10,888.57 <br />TURNAROUND TIMES: <br />Our company's mission is to produce your signage as quickly as possible. We <br />make every effort to complete the manufacturing of your custom signage within <br />a 8 to 15 business day window following design approval. Current supply chain <br />disruptions and the variability in manufacturing capacity due to Covid protocols <br />makes standard turn-around times very challenging. For orders requiring <br />installation, in general expect an additional 5 to 10 business days to complete. <br />We work at the pleasure of our customers. Please speak with your sales <br />representative when you have a hard deadline that needs to be met. <br />Guaranteed rush orders are available on quick turn signage manufactured in our <br />main fabrication department. Additional fees apply. Please ask your sales <br />representative for details. <br />Custom fabricated signs require a longer production cycle and may take as long <br />as 4 to 6 weeks or longer depending on the complexity, the quantity of signs <br />ordered, and the scope of the project. If your sign requires permitting, we do not <br />begin fabrication until we have an approved permit from your town's planning <br />department. <br />The above-mentioned prices specifications and conditions are satisfactory and are hereby accepted. <br />You are authorized to do all the work specified. Payment will be made as outlined above. <br />Signature:Date: <br />Generated On: 3/22/2024 4:51 PM Page 2 of 2 <br />Each office is independently owned and operated, for more info please go to signarama.com <br />Choose DesignElement for quick turn signs to multi phase developments, digital pylon signs, entry monuments, and more! <br />DocuSign Envelope ID: 33CCA168-B711-45E0-9A2C-EF113725C6BF <br />3/26/2024
The URL can be used to link to this page
Your browser does not support the video tag.