Browse
Search
2024-193-E-AMS-Greer and Associates-Whitted Signage
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-193-E-AMS-Greer and Associates-Whitted Signage
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2024 8:38:21 AM
Creation date
5/28/2024 8:38:16 AM
Metadata
Fields
Template:
Contract
Date
3/26/2024
Contract Starting Date
3/26/2024
Contract Ending Date
3/26/2024
Contract Document Type
Contract
Amount
$21,840.21
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a 8 to 15 business day window following design approval. Current supply chain <br />disruptions and the variability in manufacturing capacity due to Covid protocols <br />makes standard turn-around times very challenging. For orders requiring <br />installation, in general expect an additional 5 to 10 business days to complete. <br />We work at the pleasure of our customers. Please speak with your sales <br />representative when you have a hard deadline that needs to be met. <br />Guaranteed rush orders are available on quick turn signage manufactured in our <br />main fabrication department. Additional fees apply. Please ask your sales <br />representative for details. <br />Custom fabricated signs require a longer production cycle and may take as long <br />as 4 to 6 weeks or longer depending on the complexity, the quantity of signs <br />ordered, and the scope of the project. If your sign requires permitting, we do not <br />begin fabrication until we have an approved permit from your town's planning <br />department. <br />The above-mentioned prices specifications and conditions are satisfactory and are hereby accepted. <br />You are authorized to do all the work specified. Payment will be made as outlined above. <br />Signature:Date: <br />Generated On: 3/22/2024 11:33 AM Page 3 of 3 <br />Each office is independently owned and operated, for more info please go to signarama.com <br />Choose DesignElement for quick turn signs to multi phase developments, digital pylon signs, entry monuments, and more! <br />DocuSign Envelope ID: 33CCA168-B711-45E0-9A2C-EF113725C6BF <br />3/26/2024
The URL can be used to link to this page
Your browser does not support the video tag.