Browse
Search
2024-177-E-Tax Dept-Farragut Systems-Software enhancement - move from Custom to Standard Finance Interface within the North Carolina property tax solution billing and collections software system
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-177-E-Tax Dept-Farragut Systems-Software enhancement - move from Custom to Standard Finance Interface within the North Carolina property tax solution billing and collections software system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2024 8:24:54 AM
Creation date
5/28/2024 8:24:48 AM
Metadata
Fields
Template:
Contract
Date
3/19/2024
Contract Starting Date
3/19/2024
Contract Ending Date
3/26/2024
Contract Document Type
Contract
Amount
$6,000.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />2024‐03‐18 Statement of Work ‐ Orange County Move to Standard Finance Page 3 <br /> <br />COST <br />The estimated cost for the MOVE TO STANDARD FINANCE Project is $6,000 based on the <br />estimated 40 hours required to complete the project, as described within the Services section. <br /> <br />TERMS <br /> Farragut proposes to complete the project on a project cost basis subject to a minimum <br />total fee. The minimum total fee will be $5250 and maximum total fee will be $6,000. <br /> If the level of effort required to complete the project scope is subject to the minimum <br />and maximum fee is more than the maximum total fee, the total costs to the County will <br />be the maximum fee. If the level of effort required to complete the project scope is <br />subject to the minimum and maximum fee is less than the minimum total fee, the total <br />costs to the County will be the minimum fee. If the level of effort required to complete <br />the project scope that is subject to the minimum and maximum fee is between the <br />minimum total fee and the maximum total fee, then the total costs to the County will be <br />the actual project costs. <br /> In the event that there is a scope change, the County and Farragut must mutually agree <br />in order to modify the Services and/or costs. <br /> <br /> Help Center will be used for issue entry and tracking for all work associated with the <br />project. <br /> <br /> There is no warranty period associated with this “Statement of Work”. <br /> <br /> Payment is due to Farragut within thirty (30) days after receipt of an invoice. Invoices will <br />be deemed to have been accepted for which Farragut does not receive timely notification <br />of a dispute and the County shall pay all undisputed amounts due under such invoices. <br /> <br /> The amounts do not include out‐of‐pocket expenses such as travel expenses, which will <br />be billed at Farragut cost. <br /> <br /> To the extent that the Services specified in this Statement of Work are modified or <br />changed, the rates specified in a mutually approved Change Order related to such <br />modification or change shall apply to such changes and/or modifications. <br /> <br /> <br /> <br />DocuSign Envelope ID: E320FF23-251D-4282-AF69-0B0F0477273C
The URL can be used to link to this page
Your browser does not support the video tag.