DocuSign Envelope ID:07A4359F-6D47-4987-B1F1-BF667ACBB3BA
<br /> C. GRADING -This Work shall consist of furnishing all labor, material, equipment,tools, and other items
<br /> necessary and incidental to perform grading and perimeter berm installation as dictated by the
<br /> Contract, including quantity verification, project record documents, and stakeout. Work shall include
<br /> installing and protecting any necessary benchmarks. Payment for this line item will be made under a
<br /> one-time charge and will constitute full compensation for all labor, equipment,tools, and other items
<br /> necessary and incidental to the completion of this work.
<br /> D. 15-INCH SMOOTH LINED CORRUGAED HDPE -This Work shall consist of furnishing all labor, material,
<br /> equipment,tools, and other items necessary and incidental to install and implement the 15-inch smooth
<br /> lined corrugated HDPE pipe.This item includes trench excavation, pipe placement, backfill, and
<br /> compaction. Payment for this line item will be made upon a unit rate basis, established by field
<br /> measurements of access centerline, following final installation.
<br /> E. 4-INCH PVC DRAIN—This Work shall consist of furnishing all labor, material, equipment,tools, and other
<br /> items necessary and incidental to install and implement the 4-inch PVC Drain.This item includes trench
<br /> excavation, pipe placement, backfill, and compaction. Payment for this line item will be made upon a
<br /> unit rate basis, established by field measurements of access centerline, following final installation.
<br /> F. GRAVEL PAVING -This Work shall consist of furnishing all labor, material, equipment, tools, and other
<br /> items necessary and incidental to install and implement gravel paving.This item includes subgrade
<br /> compaction, 8 oz geotextile installation,#2 NCDOT stone installation,ABC stone installation and
<br /> compaction. Payment for this line item will be made upon a unit rate basis, established by field
<br /> measurements of access centerline, following final installation.
<br /> G. RIPRAP (CLASS B)—This Work shall consist of furnishing all labor, material, equipment,tools, and other
<br /> items necessary and incidental to install and implement class B riprap.This item includes subgrade
<br /> compaction,4 oz geotextile installation, and class B riprap installation. Payment for this line item will be
<br /> made upon a unit rate basis, established by field survey measurements, performed by the Contractor,
<br /> and provided to the Engineer.
<br /> H. 4" UNDERDRAIN—This Work shall consist of furnishing all labor, material, equipment,tools, and other
<br /> items necessary and incidental to install and implement the 4-inch perforated PVC underdrain.This item
<br /> includes trench excavation, pipe placement, #57 stone backfill, and compaction. Payment for this line
<br /> item will be made upon a unit rate basis, established by field measurements of access centerline,
<br /> following final installation.
<br /> I. 12" HDPE and associated Drop Inlet/Junction Boxes—This Work shall consist of furnishing all labor,
<br /> material, equipment,tools, and other items necessary and incidental to install and implement the 12-
<br /> smooth lined HDPE pipe and precast concrete drop inlet/junction boxes.This item includes trench
<br /> excavation, pipe/structure placement, backfill, and compaction. Payment for this line item will be made
<br /> upon a unit rate basis, established by field measurements of access centerline or per structure,following
<br /> final installation.
<br /> J. CONCRETE STAIRS, SIDEWALK, AND CONCRETE SLAB--This Work shall consist of furnishing all labor,
<br /> material, equipment,tools, and other items necessary and incidental to install and implement cast-in-
<br /> place reinforced concrete items.This item includes excavation, gravel subgrade installation, backfill,
<br /> reinforcing steel, handrails and concrete placement/finishing. Payment for this line item will be made
<br /> upon a unit rate basis, established by field measurements of square footage or item,following final
<br /> installation.
<br /> Orange County Solid Waste Drainage Repairs DAA 2200365/TRC 017055.0000.0000
<br /> Drainage Repair Project Revised Addendum 3—Jan 2024
<br /> Orange County, NC Form of Proposal-3/5
<br />
|