Browse
Search
2024-195-E-Solid Waste-Moffat Pipe-Drainage Repairs
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-195-E-Solid Waste-Moffat Pipe-Drainage Repairs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2024 8:07:49 AM
Creation date
5/28/2024 7:59:25 AM
Metadata
Fields
Template:
Contract
Date
3/31/2024
Contract Starting Date
3/31/2024
Contract Ending Date
4/7/2024
Contract Document Type
Contract
Amount
$341,995.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:07A4359F-6D47-4987-B1F1-BF667ACBB3BA <br /> ORANGE COUNTY SOLID WASTE Addendum No. 1 <br /> DRAINAGE REPAIRS Page 1 of 1 <br /> 'o` <br /> IV T C <br /> ADDENDUM No. 1 <br /> ORANGE COUNTY SOLID WASTE DRAINAGE REPAIRS <br /> Bidders on this Project are hereby notified that this Addendum shall be attached to and made part of <br /> the Contract Documents. <br /> The following items are issued to add to, modify, and clarify the Contract Documents. These items shall <br /> have full force and effect as the Contract Documents, and cost involved shall be included in the bid <br /> prices. Bids, to be submitted on the specified date, shall be based on the additions and revisions listed <br /> herein. <br /> Acknowledge receipt of the Addendum by checking its number on the appropriate page of the bid <br /> form. Failure to do so may subject the bidder to disqualification. <br /> Clarifications/Additions to Documents: <br /> 1. Figure #1: Concrete Pad Detail <br /> Questions: <br /> 1. What is the thickness of the concrete pad at Walnut Grove? 6-inches, see the attached detail. <br /> 2. Can a detail (for the concrete pad) be provided?Yes, please see the attached detail. <br /> 3. Are there any requirements and/or details for the junction boxes at Walnut Grove? If so, can they be <br /> provided?They are NCDOT Concrete Drop Inlets see NCDOT Standard Detail 840.14. <br /> Attachments: <br /> Figure #1: Concrete Pad Detail <br /> END OF ADDENDUM #1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.