Orange County NC Website
DocuSign Envelope ID:07A4359F-6D47-4987-B1F1-BF667ACBB3BA <br /> EROSION AND SEDIMENT CONTROL—0157 00 <br /> PART 1 - GENERAL <br /> 1.1 Requirements Included <br /> A. Contractor shall provide personnel, equipment, materials, and supplies to reduce <br /> erosion and control sediment during the Project. <br /> B. Contractor shall comply with local and state erosion control regulations and comply (at <br /> a minimum) with erosion and sediment controls as set forth on the Drawings. <br /> C. Contractor is solely responsible for control of erosion on site and is responsible for <br /> taking measures to reduce and control erosion. Measures may be necessary above <br /> and beyond those shown on the Drawings, and Contractor shall implement any <br /> additional measures that it deems necessary or as required by the NCDEQ Erosion <br /> Control inspection personnel. <br /> D. Additional compensation will not be paid for measures installed in conjunction with <br /> the development and operations of stockpile or borrow areas. Costs for these efforts <br /> are already included in the Contract Price. <br /> 1.2 Related Requirements <br /> A. NCDEQ Erosion and Sediment Control Manual, latest edition <br /> B. Section 0150 00—Temporary Facilities and Controls <br /> C. Section 3110 00—Site Clearing <br /> D. Section 3120 00— Earth Moving <br /> PART 2 - PRODUCTS <br /> 2.1 General <br /> A. All products used for erosion and sediment control will be as specified by the NCDEQ <br /> Erosion and Sediment Control Manual, latest edition. <br /> PART 3 - EXECUTION <br /> 3.1 General <br /> A. All activities shall be performed in accordance with the approved erosion control plan. <br /> Orange County Solid Waste Drainage Repairs DAA 2200365/TRC 017055.0000.0000 <br /> Drainage Repair Project November 2023 <br /> Orange County, INC 015700- 1/2 <br />